My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09142021
StAnthony
>
City Council
>
City Council Packets
>
2021
>
CC PACKET 09142021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2021 4:24:32 PM
Creation date
9/9/2021 4:15:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Civil Engineering Surveying Landscape Architecture4931 W. 35th Street, Suite 200St. Louis Park, MN 55416civilsitegroup.com 612-615-00602401 NE LOWRY AVE <br />2401 NE LOWRY AVENUE; ST. ANTHONY, MN 55418 <br />6390 CARLSON DRIVE; EDEN PRAIRIE, MN 55346 <br />INTERSTATE DEVELOPMENT CORPORATION <br />PROJECT <br />ISSUE/SUBMITTAL SUMMARYDATEDESCRIPTION. .. .. .. .. .. .PROJECT NUMBER:2130809/1/21 CITY RE-SUBMITTAL. .. .. .. .. .07/20/21 CITY SUBMITTALDRAWN BY:REVIEWED BY:KW, RLMP, PS. .. .. .. .. .. .. .COPYRIGHT CIVIL SITE GROUP INC.cP <br />R <br />E <br />L <br />IM <br />I <br />N <br />A <br />R <br />Y <br />: <br />N <br />O <br />T <br /> <br />F <br />O <br />R <br />C <br />O <br />N <br />S <br />T <br />R <br />U <br />C <br />T <br />I <br />O <br />N44263Matthew R. PavekLICENSE NO.DATEI HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OFMINNESOTA.09/01/21REVISION SUMMARYDATEDESCRIPTIONSW1.5SWPPP - ATTACHMENTS. .. .. .. .. .. .ATTACHMENT B: SWPPP INSPECTION FORMATTACHMENT C: MAINTENANCE PLAN FOR PERMANENT STORM WATER TREATMENT SYSTEMNOTE: THIS INSPECTION REPORT DOES NOT ADDRESS ALL ASPECTS OF THE NATIONAL APOLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM (NPDES/SDS) CONSTRUCTION STORMWATER PERMIT ISSUED ON AUGUST 1,2013. THE COMPLETION OF THIS CHECKLIST DOES NOT GUARANTEE THAT ALL PERMIT REQUIREMENTS ARE IN COMPLIANCE; IT IS THE RESPONSIBILITY OF THE PERMITTEE(S) TO READ AND UNDERSTAND THE PERMIT REQUIREMENTS.FACILITY INFORMATIONSITE NAME: FACILITY ADDRESS: PERMIT NUMBER:CITY: STATE: ZIP CODE:INSPECTION INFORMATIONINSPECTOR NAME: _______________________ PHONE NUMBER: _________________________DATE (MM/DD/YYYY): _____________________ TIME: ____________ AM / PMIS THE INSPECTOR CERTIFIED IN SEDIMENT AND EROSION CONTROL AND IS IT DOCUMENTED IN THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP)?IS THIS INSPECTION ROUTINE OR IN RESPONSE TO A STORM EVENT:RAINFALL AMOUNT (IF APPLICABLE): ____________IS THE SITE WITHIN ONE AERIAL MILE OF A SPECIAL OR IMPARED WATER?IF YES, FOLLOW APPENDIX A AND OTHER APPLICABLE PERMIT REQUIREMENTSNOTE: IF N/A IS SELECTED AT ANY TIME, SPECIFY WHY IN THE COMMENT AREA FOR THAT SECTION.EROSION CONTROL REQUIREMENT (PART IV.B)1. SOIL STABILIZATION WHERE NO CONSTRUCTION ACTIVITY FOR 14 DAYS? (7 DAYS WHERE APPLICABLE)2. HAS THE NEED TO DISTURB STEEP SLOPES BEEN MINIMIZED?3. ALL DITCHES STABILIZED 200; BACK FROM POINT OF DISCHARGE WITHIN 24 HOURS? (NOT MULCH)4. ARE THERE BMP'S FOR ONSITE STOCKPILES?5. ARE APPROPRIATE BMP'S INSTALLED PROTECTING INLETS/OUTLETS?6. DO PIPE OUTLETS HAVE ENERGY DISSIPATION?COMMENTS:SEDIMENT CONTROL REQUIREMENT (PART IV.C)1. PERIMETER CONTROL INSTALLED ON ALL DOWN GRADIENT PERIMETERS?2. PERIMETER CONTROL TRENCHED IN WHERE APPROPRIATE?3. 50 FOOT NATURAL BUFFER MAINTAINED AROUND ALL SURFACE WATERS?3.1. IF NO, HAVE REDUNDANT SEDIMENT CONTROLS BEEN INSTALLED?4. INLET PROTECTION ON ALL CATCH BASINS AND CULVERT INLETS?5. VEHICLE TRACKING BEST MANAGEMENT PRACTICES (BMP'S) AT ALL SITE EXITS?6. ALL TRACKED SEDIMENT REMOVED WITHIN 24 HOURS?7. ARE ALL INFILTRATION SYSTEMS STAKED AND MARKED TO AVOID COMPACTION?8. ARE ALL INFILTRATION AREAS PROTECTED WITH A PRETREATMENT DEVICE?9. DO ALL STOCKPILES HAVE PERIMETER CONTROLS?COMMENTS:MAINTENANCE-EROSION AND SEDIMENT CONTROL BMP'S (PART IV.E.)1. ARE ALL PREVIOUSLY STABILIZED AREAS MAINTAINING 90% GROUND COVER?2. ANY DITCH EROSION OBSERVED?3. PERIMETER CONTROL--HAS SEDIMENT REACHED ONE HALF THE HEIGHT OF THE DEVICE?4. ARE INLET PROTECTION DEVICES MAINTAINED AND FUNCTIONING PROPERLY?COMMENTS:OTHER1. ARE ALL MATERIALS THAT CAN LEACH POLLUTANTS UNDER COVER?2. HAS ACCESS BEEN RESTRICTED TO ONSITE HAZARDOUS MATERIALS?3. DOES ON-SITE FUELING ONLY OCCUR IN A CONTAINED AREA?4. ARE ALL SOLID WASTES BEING PROPERLY DISPOSED OF?5. IS THE CONCRETE WASHOUT AREA COMPLETELY CONTAINED?6. IS THE CONCRETE WASHOUT AREA MARKED WITH SIGN?COMMENTS:7. WERE ANY DISCHARGES SEEN DURING THIS INSPECTION, SEDIMENT, WATER, OR OTHERWISE?7.1. IF YES, STATE THE EXACT LOCATION OF ALL POINTS OF DISCHARGE. PHOTOGRAPH THE DISCHARGE AND DESCRIBE THE DISCHARGE (COLOR, ODOR, FOAM, OIL SHEEN, ETC). HOW WILL IT BE REMOVED? HOW DID THE DISCHARGEHAPPEN? HOW MUCH WAS DISCHARGED? HOW WILL IT BE STOPPED, AND HOW LONG WILL IT TAKE TO STOP? IS THE DISCHARGE GOING INTO AN ADJACENT SITE? WAS THE DISCHARGE A SEDIMENT DELTA? IF YES, WILL THE DELTA BERECOVERED WITHIN 7 DAYS?8. WILL A PERMANENT STORMWATER MANAGEMENT SYSTEM BE UTILIZED IN THIS PROJECT AS REQUIRED AND IN ACCORDANCE WITH PART III.D OF THE PERMIT? DESCRIBE:9. IS ANY DEWATERING OCCURRING ON SITE?9.1. IF YES, WHERE? WHAT BMP IS BEING USED? HOW MUCH WATER IS BEING DEWATERED? IS THE WATER CLEAR? WHERE IS THE WATER BEING DISCHARGED TO?10. IS A COPY OF THE SWPPP LOCATED ON THE CONSTRUCTION SITE?11. HAS THE SWPPP BEEN FOLLOWED AND IMPLEMENTED ON SITE?12. IS A SEDIMENTATION BASIN REQUIRED FOR THIS PROJECT AS SPECIFIED IN THE PERMIT?12.1. IF YES, ARE THEY MAINTAINED AS SPECIFIED IN THE PERMIT?13. IS THE TOPSOIL ON THIS PROJECT BEING PRESERVED?13.1. IF YES, EXPLAIN HOW THE TOP SOIL IS BEING PRESERVED. IF NO, EXPLAIN WHY IT WAS INFEASIBLE.14. ARE ALL INFILTRATION SYSTEMS MARKED TO AVOID COMPACTION?14.1. DO ALL INFILTRATION AREAS HAVE PRETREATMENT DEVICES?15. DESCRIPTION OF AREAS OF NON-COMPLIANCE NOTED DURING THE INSPECTION, REQUIRED CORRECTIVE ACTIONS, AND RECOMMENDED DATE OF COMPLETION OF CORRECTIVE ACTIONS:16. PROPOSED AMENDMENTS TO THE SWPPP:17. POTENTIAL AREAS OF FUTURE CONCERN:18. ADDITIONAL COMMENTSDISCLOSURES:·AFTER DISCOVERY, THE PERMIT REQUIRES MANY OF THE DEFICIENCIES THAT MAY BE FOUND IN THIS CHECKLIST BE CORRECTED WITHIN A SPECIFIED PERIOD OF TIME. SEE PERMIT FOR MORE DETAILS.·THIS INSPECTION CHECKLIST IS AN OPTION FOR SMALL CONSTRUCTION SITES. LARGE CONSTRUCTION SITES AND LINEAR PROJECTS REQUIRE MORE EXTENSIVE/MORE LOCATION SPECIFIC INSPECTION REQUIREMENTS.·THE PERMITTEE(S) IS/ARE RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BMP'S AS WELL AS EROSION PREVENTION AND SEDIMENT CONTROL BMP'S UNTILANOTHER PERMITTEE HAS OBTAINED COVERAGE UNDER THIS PERMIT ACCORDING TO PART II.B.5., OR THE PROJECT HAS UNDERGONE FINAL STABILIZATION AND A NOTICE OF TERMINATION HAS BEEN SUBMITTED TO THE MPCA.Y N N/AY N N/AY N N/AY N N/AY N N/AY N N/AY N N/AY N N/A86
The URL can be used to link to this page
Your browser does not support the video tag.