Laserfiche WebLink
10/20/2021 <br />7 <br />STORMWATER FUND <br />2021 <br />2006 Street Sweeper <br />replaced <br />Repair of a failed <br />stormwater pipe along 33rd <br />Avenue <br />Future <br />Harding Pond was established in <br />the early 2000’s <br />Harding Pond was designed to <br />accommodate a 100-year flood <br />event. <br />Maintenance needs are evaluated <br />to determine if the existing flood <br />capacity adequate. <br />The $272,000 project anticipates <br />addressing a capacity issue. The <br />project cost maybe revised based <br />on further Engineer findings. <br />Estimated timing and costs for <br />maintenance of remaining <br />retention ponds will be developed <br />in 2022-2023 <br />STREET IMPROVEMENT <br />& DEBT SERVICE FUNDS <br />SOURCES <br />Street improvement debt levy <br />Bond proceeds <br />Assessments <br />MSA allocation <br />One-time revenues <br />& project savings <br />USES <br />Street improvement debt <br />Street reconstruction <br />Utility reconstruction <br />Street lights <br />Sidewalks <br />Mill & overlays <br />Alleys