Laserfiche WebLink
City Council Regular Meeting Minutes <br />October 26, 2021 <br />Page 7 <br />1 availability of resources, allows time for the investigating replacement alternatives such as <br />2 sharing of equipment, leasing, and new equipment options that provide more functionality or are <br />3 less costly. <br />4 <br />5 Ms. Rueckert reviewed the Annual Update Process. The sources for the Buildings Improvement <br />6 Fund are Building improvement levy and Community Center transfer. The uses include HVAC, <br />7 roofs, lighting, security, windows & doors and tuck -pointing. The 2021 Buildings Improvement <br />8 Fund included the 5 HVAC roof top units at City Hall being replaced. The GPS NPBI <br />9 technology was re -installed into new HVAC units. Future items were reviewed <br />10 <br />11 The Capital Equipment Fund sources include capital equipment levy, equipment sales (trade-ins <br />12 & donations) and MSA allocation. This fund is used for fleet including squads and unmarked, <br />13 public works trucks and fire trucks and rescue vehicles. Also included is heavy equipment, <br />14 specialty equipment and technology. The 2021 Capital Equipment Fund included squad car <br />15 replacement based on mileage — estimated life of 3-4 years; 3 squads replaced in 2021 — one <br />16 deferred from 2020 and a 2010 Toro Grandstand mower replaced. Future items were reviewed. <br />17 <br />18 The Park Improvement Fund sources are parkland dedication fees, donations & grants, and park <br />19 improvement levy. The fund is used for athletic facilities & playground structures, park shelters, <br />20 splash pads and trail construction. The 2021 Park Improvement Fund included Tennis Court <br />21 resurfacing and painting. Future items were reviewed. <br />22 <br />23 The Utilities infrastructure fund sources are connection fees, collection of inter -fund loans, <br />24 grants as available and utility fund transfer which begins in 2024. The fund is used for water <br />25 infrastructure & equipment, sewer infrastructure & equipment, and fiber infrastructure & <br />26 equipment. In 2021 the 2006 water utility van was replaced and the water system risk analysis <br />27 and response plan were completed. Future items were reviewed. <br />28 <br />29 The Stormwater Fund sources are stormwater fees and watershed grants & cost sharing. This <br />30 fund is used for permitting (MS4) and agency reporting, engineering studies, stormwater pond <br />31 maintenance, flood improvements and water quality activities. With this fund was used in 2021 <br />32 to replace the 2006 street sweeper and to repair a failed stormwater pipe along 33'd Avenue. <br />33 Future items were reviewed. <br />34 <br />35 The Street Improvement and Debt Service Fund sources are street improvement debt levy, bond <br />36 proceeds, assessments, MSA allocation and one-time revenues and project savings. The fund is <br />37 used for street improvement debt, street reconstruction, utility reconstruction, streetlights, <br />38 sidewalks, mill & overlays and alleys. Ms. Rueckert showed maps indicating the 2022 Street and <br />39 Utility Improvement Projects. <br />40 <br />41 The Phase II Debt Levy Benefits and Resulting Debt Levy Program for 2022 — 2037 were <br />42 reviewed. The debt levy will remain at $2,487,181 for levy years 2022 and 2023 which is same <br />43 as was for 2020-2021. The capital plan can be found on the City's website. <br />44 <br />45 Councilmember Webster thanked Ms. Rueckert for the overview and comments. <br />46 <br />