Laserfiche WebLink
2/17/2022 <br />5 <br />Checking Purpose & Need <br />May 15 ‐June 21, 2020 Online, on‐demand, and interactive public open house <br />Confirm that the problems we identified  <br />are in line with what the community thinks <br />Feedback opportunities:  <br />Brief online survey and comment form <br />Top  themes from open‐ended comments <br />Proposed solutions for  <br />specific locations along this  <br />stretch of I‐35W <br />Prioritize pedestrian and  <br />bicycle infrastructure and  <br />expand facilities <br />Expand transit  <br />facilities and  <br />infrastructure <br />Consider environmental  <br />impacts and reduce  <br />pollution <br />Reduce highway  <br />congestion <br />Developing Long‐Term   <br />Solutions <br />Address bridge and pavement  <br />conditions <br />Increase mobility <br />Improve travel time reliability <br />Improve transit advantage <br />Improve connectivity across 35W  <br />and interaction with community