Laserfiche WebLink
REPORT RECOMMENDATIONS <br />PARK SHORT TERM LONG TERM <br />Silver Point Park Replace pea gravel at play structure <br />with accessible surface. <br />Accessible picnic tables, benches, <br />ballfields. <br />Accessible parking. <br />Additional Wayfinding on Silver Lake <br />Road & 29th Ave <br />Replace Play Structure <br />Repave Trails <br />Water Tower Park Accessible parking at Tennis Court <br />with crosswalk to playground area <br />Provide accessible picnic tables and <br />benches. <br />Replace Play Structure <br />Provide an accessible sidewalk/trail <br />connection to the Central Park and <br />City Hall without having to travel out <br />to sidewalks along 33rd Ave and Silver <br />Lake Road. <br />Central Park Provide accessible picnic tables and <br />benches. <br />Accessible parking <br />Relocate/additional accessible parking <br />near City Hall/Community Center. <br />Add Pickleball Courts <br />Replace Play Structure <br />Trail Replacement <br />Accessible sidewalk/trail connection to <br />the Water Tower Park. <br />Emerald Park Provide accessible route to picnic <br />shelter and grill. <br />Provide improved accessible parking <br />Provide accessible seating and access <br />to ballfield <br />Replace Play Structure <br />Replace asphalt trails in poor condition <br />Tennis Court <br />“Well House Park” <br />Clean, fill cracks, and resurface court Provide additional parking options <br />Provide accessible route to court. <br />Provide accessible parking. <br />Rebuild court <br />DISCUSSION ITEMS FOR COMMISSION FEEDBACK <br />Below are the specific items for discussion and feedback for staff: <br />Does the Commission have any additional thoughts or observations for staff to integrate into the CIP? <br />Does the Commission have any thoughts on changes to the current amenities in any of the parks to <br />recommend to the City Council? <br />Other considerations for staff? <br />NEXT STEPS <br />Staff will utilize the WSB report and Commission feedback to refine the 2023 CIP and will bring details of <br />that to the September, 2022 PEC meeting. <br />ATTACHMENTS: <br />WSB Parks Amenities Assessment