My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05242022
StAnthony
>
City Council
>
City Council Packets
>
2022
>
CC PACKET 05242022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2022 3:26:37 PM
Creation date
7/13/2022 3:24:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />K:\019210-000\Admin\Docs\LTR-hmcc-051822.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM May 18, 2022 <br /> <br /> <br />Honorable Mayor, City Council and Staff <br />c/o Charlie Yunker, City Manager <br />City of St. Anthony Village <br />3301 Silver Lake Road NE <br />St. Anthony, MN 55418 <br /> <br /> <br />Re: Stormwater Facility Maintenance Agreement <br />Bremer Bank – PID #0702923240021 and 0702923240020 <br /> St. Anthony Village, MN <br /> <br />Dear Honorable Mayor, City Council, and Staff: <br /> <br />Following this letter is a Stormwater Facilities Maintenance Agreement and Restrictive Covenant <br />related to the Bremer Bank improvement project. Such an agreement is required as the <br />improvement as proposed will consist of constructing an underground stormwater collection and <br />treatment facility on the Property. Per the Agreement, the applicant shall: <br /> <br />1. Agree to construct and maintain an underground stormwater management facility on his/her <br />property as shown on the approved drawing in exhibit B. <br />2. Maintain and preserve the underground stormwater management facility until such time as <br />the City, its successors or assigns, agree that the underground stormwater management <br />facility should be altered in some manner or eliminated. <br />3. Not to dismantle, revise, alter or remove part of the underground stormwater management <br />facility except as necessary for maintenance, repair, or replacement. <br />4. Be responsible for inspecting and maintaining the underground stormwater management <br />facility, on an annual basis. The property owner will provide a letter to the City Engineer by <br />September 1st of each year, stating that inspection and maintenance have been completed. <br />5. Assume all responsibility for the cost of any maintenance and for repairs to the drainage <br />underground stormwater management facility. Such responsibility shall include <br />reimbursement to the City within 30 days after the City mails an invoice to the Owner for any <br />work performed by the City. Overdue payments will require payment of interest by the Owner <br />at the current legal rate as liquidated damages. <br />6. Obtain written approval from the City Engineer prior to performing any alterations or <br />modifications to the underground stormwater management facility. <br /> <br />If you have any questions, I will be present to discuss this at the May 24, 2022, Council Meeting <br />or please call me at 612.388.9652. <br /> <br />Sincerely, <br /> <br />WSB <br /> <br /> <br />Justin Messner, PE <br />City Engineer <br /> <br />Attachments <br /> <br />cc: Nicole Miller, City of St. Anthony Village <br />43
The URL can be used to link to this page
Your browser does not support the video tag.