Laserfiche WebLink
PROPOSED <br />FFE=968.1 <br />3,308 S.F. <br />7 <br />13 <br />11 <br />T963 964 964 9649639639639649649649649649639 <br />6 <br />4 <br />964 9649659659619629639649659659659659629639639 <br />6 <br />3 963963964964964965965965965963963963964964966966965 <br />965963964 966966CONSTRUCTION ENTRANCE <br />SILT FENCE <br />BIOROLL LIMIT OF CONSTRUCTION <br />LIMIT OF CONSTRUCTION <br />LIMIT OF CONSTRUCTION <br />CONSTRUCTION FENCE <br />CONSTRUCTION FENCE <br />CONSTRUCTION FENCE <br />SILT FENCE <br />CONSTRUCTION FENCE <br />This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.SHEET NUMBER 2022 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\the architects partnership\st. anthony, mn - chase bank\3 Design\CAD\plansheets\C3-EROS PH2 PLAN.dwg May 13, 2022 - 12:51pmBYREVISIONSNo.DATEPRELIMINARY - NOT FOR CONSTRUCTIONPREPARED FOREROSION ANDSEDIMENTCONTROL PLAN -PHASE 2C301CHASE BANK - SILVERLAKE RD & 39TH AVETHE ARCHITECTSPARTNERSHIPST. ANTHONYMNDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA.MNLIC. NO.BRIAN M. WURDEMAN, P.E.05/02/202253113DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT16009402905/02/2022AS SHOWNSJSSJSBMWNORTH <br />EROSION CONTROL PLAN NOTES <br />1.ALL PERIMETER SILT FENCE AND ROCK CONSTRUCTION ENTRANCES <br />SHALL BE INSTALLED PRIOR TO CONSTRUCTION. <br />2.THE CONTRACTOR SHALL CONSTRUCT DRAINAGE BASINS PRIOR TO <br />SITE GRADING. <br />3.THE CONTRACTOR SHALL INSTALL CATCH BASIN EROSION CONTROL <br />MEASURES. <br />4.WITHIN TWO WEEKS (14 DAYS) OF SITE GRADING, ALL DISTURBED <br />AREAS SHALL BE STABILIZED WITH SEED, SOD, OR ROCK BASE. REFER <br />TO LANDSCAPE PLANS FOR MATERIALS. <br />5.ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AND <br />MAINTAINED IN ACCORDANCE WITH CITY, STATE, AND WATERSHED <br />DISTRICT PERMITS. <br />6.THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL <br />MEASURES, INCLUDING THE REMOVAL OF SILT IN FRONT OF SILT <br />FENCES DURING THE DURATION OF THE CONSTRUCTION. <br />7.ANY EXCESS SEDIMENT IN PROPOSED BASINS SHALL BE REMOVED BY <br />THE CONTRACTOR. <br />8.REMOVAL ALL EROSION CONTROL MEASURES AFTER VEGETATION IS <br />ESTABLISHED. <br />9.THE CONTRACTOR SHALL REMOVE ALL SOILS AND SEDIMENT TRACKED <br />ONTO EXISTING STREETS AND PAVED AREAS AND SHALL SWEEP <br />ADJACENT STREETS AS NECESSARY IN ACCORDANCE WITH CITY <br />REQUIREMENTS. <br />10.IF BLOWING DUST BECOMES A NUISANCE, THE CONTRACTOR SHALL <br />APPLY WATER FROM A TANK TRUCK TO ALL CONSTRUCTION AREAS. <br />UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: <br />TRAILER, PARKING, LAYDOWN, PORTA-POTTY, WHEEL WASH, <br />CONCRETE WASHOUT, FUEL AND MATERIAL STORAGE CONTAINERS, <br />SOLID WASTE CONTAINERS, ETC., IMMEDIATELY DENOTE THEM ON THE <br />SITE MAPS AND NOTE ANY CHANGES IN LOCATION AS THEY OCCUR <br />THROUGHOUT THE CONSTRUCTION PROCESS. <br />BMP AND EROSION CONTROL INSTALLATION SEQUENCE SHALL BE AS <br />FOLLOWS: <br />1.TEMPORARILY SEED, THROUGHOUT CONSTRUCTION, DENUDED <br />AREAS THAT WILL BE INACTIVE FOR 7 DAYS OR MORE. <br />2.INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, <br />UNDERGROUND SYSTEM, CURBS AND GUTTERS. <br />3.INSTALL APPROPRIATE INLET PROTECTION AT ALL STORM SEWER <br />STRUCTURES AS EACH INLET STRUCTURE IS INSTALLED. <br />4.PERMANENTLY STABILIZE AREAS TO BE VEGETATED AS THEY ARE <br />BROUGHT TO FINAL GRADE. <br />5.PREPARE SITE FOR PAVING. <br />6.PAVE SITE AND INSTALL STRIPING. <br />7.INSTALL APPROPRIATE INLET PROTECTION DEVICES FOR PAVED <br />AREAS AS WORK PROGRESSES. <br />8.COMPLETE GRADING AND INSTALLATION OF PERMANENT <br />STABILIZATION OVER ALL AREAS. <br />9.OBTAIN CONCURRENCE WITH THE CIVIL ENGINEERING <br />CONSULTANT THAT THE SITE HAS BEEN FULLY STABILIZED THEN: <br />1.REMOVE ALL REMAINING TEMPORARY EROSION ADN SEDIMENT <br />CONTROL DEVICES <br />2.STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF BMPS. <br />SEQUENCE OF CONSTRUCTION: <br />ROCK ENTRANCE <br />INLET PROTECTION <br />SILT FENCE <br />LIMITS OF DISTURBANCE <br />SAFETY FENCE <br />BIOROLL <br />LEGEND <br />EROSION CONTROL BLANKET