Laserfiche WebLink
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.SHEET NUMBER 2022 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\the architects partnership\st. anthony, mn - chase bank\3 Design\CAD\plansheets\L1-LANDSCAPE DETAILS.dwg May 13, 2022 - 12:53pmBYREVISIONSNo.DATEPRELIMINARY - NOT FOR CONSTRUCTIONPREPARED FORLANDSCAPEDETAILSL102CHASE BANK - SILVERLAKE RD & 39TH AVETHE ARCHITECTSPARTNERSHIPST. ANTHONYMNDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALLANDSCAPE ARCHITECT UNDER THE LAWS OFTHE STATE OF MINNESOTA.MNLIC. NO.RYAN A. HYLLESTED05/02/202253828DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT16009402905/02/2022AS SHOWNRAH, BJABJARAHDOUBLE SHREDDED HARDWOOD MULCH <br />NOTES: <br />2X ROOT BALL WIDTH <br />SOD <br />4" TOPSOIL <br />PREPARED PLANTING BED AND <br />BACKFILL SOIL <br />(THOROUGHLY LOOSENED) <br />NOTES: <br />1.SCARIFY SIDES AND BOTTOM OF HOLE. <br />2.PROCEED WITH CORRECTIVE PRUNING OF TOP AND ROOT. <br />3.REMOVE CONTAINER AND SCORE OUTSIDE OF SOIL MASS TO REDIRECT <br />AND PREVENT CIRCLING FIBROUS ROOTS. REMOVE OR CORRECT STEM <br />GIRDLING ROOTS. <br />4.PLUMB AND BACKFILL WITH PLANTING SOIL. <br />5.WATER THOROUGHLY WITHIN 2 HOURS TO SETTLE PLANTS AND FILL <br />VOIDS. <br />6.BACK FILL VOIDS AND WATER SECOND TIME. <br />7.PLACE MULCH WITHIN 48 HOURS OF THE SECOND WATERING UNLESS <br />SOIL MOISTURE IS EXCESSIVE. <br />8.MIX IN 3-4" OF ORGANIC COMPOST. <br />1.SCARIFY SIDES AND BOTTOM OF HOLE. <br />2.PROCEED WITH CORRECTIVE PRUNING. <br />3.SET PLANT ON UNDISTURBED NATIVE SOIL OR <br />THOROUGHLY COMPACTED PLANTING SOIL. <br />INSTALL PLANT SO THE ROOT FLARE IS AT OR UP <br />TO 2" ABOVE THE FINISHED GRADE WITH BURLAP <br />AND WIRE BASKET, (IF USED), INTACT. <br />4.SLIT REMAINING TREATED BURLAP AT 6" <br />INTERVALS. <br />5.BACKFILL TO WITHIN APPROXIMATELY 12" OF THE <br />TOP OF THE ROOTBALL, THEN WATER PLANT. <br />REMOVE THE TOP 1/3 OF THE BASKET OR THE TOP <br />TWO HORIZONTAL RINGS WHICHEVER IS <br />GREATER. REMOVE ALL BURLAP AND NAILS FROM <br />THE TOP 1/3 OF THE BALL. REMOVE ALL TWINE. <br />REMOVE OR CORRECT STEM GIRDLING ROOTS. <br />6.PLUMB AND BACKFILL WITH PLANTING SOIL. <br />7.WATER THOROUGHLY WITHIN 2 HOURS TO <br />SETTLE PLANTS AND FILL VOIDS. <br />8.BACK FILL VOIDS AND WATER SECOND TIME. <br />9.PLACE MULCH WITHIN 48 HOURS OF THE SECOND <br />WATERING UNLESS SOIL MOISTURE IS EXCESSIVE. <br />10.FINAL LOCATION OF TREE TO BE APPROVED BY <br />OWNER. <br />PLANTING SOIL <br />ON CENTER SPACING <br />AS STATED ON PLAN. <br />EXTEND HOLE EXCAVATION WIDTH <br />A MINIMUM OF 6" BEYOND <br />THE PLANTS ROOT SYSTEM. <br />FINISHED GRADE <br />EDGER, AS SPECIFIED <br />TREE PLANTING DETAIL <br />SCALE: N.T.S.L1021 SHRUB / PERENNIAL PLANTING DETAIL <br />SCALE: N.T.S.L1022 <br />MULCH <br />3/16" X 5" STEEL EDGER <br />12" STEEL EDGER SPIKE <br />TURF/SOD <br />SUBGRADE <br />12" STEEL EDGER SPIKE <br />3/16" X 5" STEEL EDGER4'MULCH <br />TURF/SOD <br />TOP OF EDGER TO BE <br />FLUSH WITH SOD <br />PLANSECTION <br />STEEL EDGER DETAIL <br />SCALE: N.T.S.L1023 <br />1.CONTRACTOR SHALL CONTACT COMMON GROUND ALLIANCE AT 811 OR CALL811.COM TO VERIFY LOCATIONS OF ALL UNDERGROUND <br />UTILITIES PRIOR TO INSTALLATION OF ANY PLANTS OR LANDSCAPE MATERIAL. <br />2.ACTUAL LOCATION OF PLANT MATERIAL IS SUBJECT TO FIELD AND SITE CONDITIONS. <br />3.NO PLANTING WILL BE INSTALLED UNTIL ALL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA. <br />4.ALL SUBSTITUTIONS MUST BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO SUBMISSION OF ANY BID AND/OR QUOTE BY THE <br />LANDSCAPE CONTRACTOR. <br />5.CONTRACTOR SHALL PROVIDE TWO YEAR GUARANTEE OF ALL PLANT MATERIALS. THE GUARANTEE BEGINS ON THE DATE OF THE <br />LANDSCAPE ARCHITECT'S OR OWNER'S WRITTEN ACCEPTANCE OF THE INITIAL PLANTING. REPLACEMENT PLANT MATERIAL SHALL HAVE A <br />ONE YEAR GUARANTEE COMMENCING UPON PLANTING. <br />6.ALL PLANTS TO BE SPECIMEN GRADE, MINNESOTA-GROWN AND/OR HARDY. SPECIMEN GRADE SHALL ADHERE TO, BUT IS NOT LIMITED BY, <br />THE FOLLOWING STANDARDS: <br />ALL PLANTS SHALL BE FREE FROM DISEASE, PESTS, WOUNDS, SCARS, ETC. <br />ALL PLANTS SHALL BE FREE FROM NOTICEABLE GAPS, HOLES, OR DEFORMITIES. <br />ALL PLANTS SHALL BE FREE FROM BROKEN OR DEAD BRANCHES. <br />ALL PLANTS SHALL HAVE HEAVY, HEALTHY BRANCHING AND LEAFING. <br />CONIFEROUS TREES SHALL HAVE AN ESTABLISHED MAIN LEADER AND A HEIGHT TO WIDTH RATIO OF NO LESS THAN 5:3. <br />7.PLANTS TO MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2014 OR MOST CURRENT VERSION) REQUIREMENTS FOR SIZE <br />AND TYPE SPECIFIED. <br />8.PLANTS TO BE INSTALLED AS PER MNLA & ANSI STANDARD PLANTING PRACTICES. <br />9.PLANTS SHALL BE IMMEDIATELY PLANTED UPON ARRIVAL AT SITE. PROPERLY HEEL-IN MATERIALS IF NECESSARY; TEMPORARY ONLY. <br />10.PRIOR TO PLANTING, FIELD VERIFY THAT THE ROOT COLLAR/ROOT FLARE IS LOCATED AT THE TOP OF THE BALLED & BURLAP TREE. IF <br />THIS IS NOT THE CASE, SOIL SHALL BE REMOVED DOWN TO THE ROOT COLLAR/ROOT FLARE. WHEN THE BALLED & BURLAP TREE IS <br />PLANTED, THE ROOT COLLAR/ROOT FLARE SHALL BE EVEN OR SLIGHTLY ABOVE FINISHED GRADE. <br />11.OPEN TOP OF BURLAP ON BB MATERIALS; REMOVE POT ON POTTED PLANTS; SPLIT AND BREAK APART PEAT POTS. <br />12.PRUNE PLANTS AS NECESSARY - PER STANDARD NURSERY PRACTICE AND TO CORRECT POOR BRANCHING OF EXISTING AND PROPOSED <br />TREES. <br />13.WRAP ALL SMOOTH-BARKED TREES - FASTEN TOP AND BOTTOM. REMOVE BY APRIL 1ST. <br />14.STAKING OF TREES AS REQUIRED; REPOSITION, PLUMB AND STAKE IF NOT PLUMB AFTER ONE YEAR. <br />15.THE NEED FOR SOIL AMENDMENTS SHALL BE DETERMINED UPON SITE SOIL CONDITIONS PRIOR TO PLANTING. LANDSCAPE CONTRACTOR <br />SHALL NOTIFY LANDSCAPE ARCHITECT FOR THE NEED OF ANY SOIL AMENDMENTS. <br />16.BACKFILL SOIL AND TOPSOIL TO ADHERE TO MN/DOT STANDARD SPECIFICATION 3877 (SELECT TOPSOIL BORROW) AND TO BE EXISTING <br />TOP SOIL FROM SITE FREE OF ROOTS, ROCKS LARGER THAN ONE INCH, SUBSOIL DEBRIS, AND LARGE WEEDS UNLESS SPECIFIED <br />OTHERWISE. MINIMUM 4" DEPTH TOPSOIL FOR ALL LAWN GRASS AREAS AND 12" DEPTH TOPSOIL FOR TREE, SHRUBS, AND PERENNIALS. <br />17.MULCH TO BE AT ALL TREE, SHRUB, PERENNIAL, AND MAINTENANCE AREAS. TREE AND SHRUB PLANTING BEDS SHALL HAVE 4" DEPTH OF <br />DOUBLE SHREDDED HARDWOOD MULCH. DOUBLE SHREDDED HARDWOOD MULCH TO BE USED AROUND ALL PLANTS WITHIN TURF AREAS. <br />PERENNIAL AND ORNAMENTAL GRASS BEDS SHALL HAVE 2" DEPTH DOUBLE SHREDDED HARDWOOD MULCH. MULCH TO BE FREE OF <br />DELETERIOUS MATERIAL AND NATURAL IN COLOR, OR APPROVED EQUAL. ROCK MULCH TO BE RIVER ROCK, 1 1/2" DIAMETER, AT MINIMUM <br />3" DEPTH, OR APPROVED EQUAL. ROCK MULCH TO BE ON COMMERCIAL GRADE FILTER FABRIC, BY TYPAR, OR APPROVED EQUAL WITH NO <br />EXPOSURE. MULCH AND FABRIC TO BE APPROVED BY OWNER PRIOR TO INSTALLATION. MULCH TO MATCH EXISTING CONDITIONS (WHERE <br />APPLICABLE). <br />18.EDGING TO BE COMMERCIAL GRADE COL-MET (OR EQUAL) STEEL EDGING; 3/16" THICK x 5" TALL, COLOR BLACK, OR SPADED EDGE, AS <br />INDICATED. STEEL EDGING SHALL BE PLACED WITH SMOOTH CURVES AND STAKED WITH METAL SPIKES NO GREATER THAN 4 FOOT ON <br />CENTER WITH TOP OF EDGER AT GRADE, FOR MOWERS TO CUT ABOVE WITHOUT DAMAGE. UTILIZE CURBS AND SIDEWALKS FOR EDGING <br />WHERE POSSIBLE. SPADED EDGE TO PROVIDE V-SHAPED DEPTH AND WIDTH TO CREATE SEPARATION BETWEEN MULCH AND GRASS. <br />INDIVIDUAL TREE, SHRUB, OR RAIN-GARDEN BEDS TO BE SPADED EDGE, UNLESS NOTED OTHERWISE. EDGING TO MATCH EXISTING <br />CONDITIONS (WHERE APPLICABLE). <br />19.ALL DISTURBED AREAS TO BE SODDED OR SEEDED, UNLESS OTHERWISE NOTED. PARKING LOT ISLANDS TO BE SODDED WITH SHREDDED <br />HARDWOOD MULCH AROUND ALL TREES AND SHRUBS. SOD TO BE STANDARD MINNESOTA GROWN AND HARDY BLUEGRASS MIX, FREE OF <br />LAWN WEEDS. ALL TOPSOIL AREAS TO BE RAKED TO REMOVE DEBRIS AND ENSURE DRAINAGE. SLOPES OF 3:1 OR GREATER SHALL BE <br />STAKED. SEED AS SPECIFIED AND PER MN/DOT SPECIFICATIONS. IF NOT INDICATED ON LANDSCAPE PLAN, SEE EROSION CONTROL PLAN. <br />20.PROVIDE IRRIGATION TO ALL PLANTED AREAS ON SITE. IRRIGATION SYSTEM TO BE DESIGN/BUILD BY LANDSCAPE CONTRACTOR. <br />LANDSCAPE CONTRACTOR TO PROVIDE SHOP DRAWINGS TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION OF <br />IRRIGATION SYSTEM. CONTRACTOR TO PROVIDE OPERATION MANUALS, AS-BUILT PLANS, AND NORMAL PROGRAMMING. SYSTEM SHALL <br />BE WINTERIZED AND HAVE SPRING STARTUP DURING FIRST YEAR OF OPERATION. SYSTEM SHALL HAVE ONE-YEAR WARRANTY ON ALL <br />PARTS AND LABOR. ALL INFORMATION ABOUT INSTALLATION AND SCHEDULING CAN BE OBTAINED FROM THE GENERAL CONTRACTOR. <br />SYSTEM SHALL INCLUDE A RAIN SENSOR AND APPROPRIATE TECHNOLOGY. <br />21.CONTRACTOR SHALL PROVIDE NECESSARY WATERING OF PLANT MATERIALS UNTIL THE PLANT IS FULLY ESTABLISHED OR IRRIGATION <br />SYSTEM IS OPERATIONAL. OWNER WILL NOT PROVIDE WATER FOR CONTRACTOR. <br />22.REPAIR, REPLACE, OR PROVIDE SOD/SEED AS REQUIRED FOR ANY ROADWAY BOULEVARD AREAS ADJACENT TO THE SITE DISTURBED <br />DURING CONSTRUCTION. <br />23.REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO OWNER. <br />24.MAINTAIN TREES, SHRUBS, AND OTHER PLANTS UNTIL PROJECT COMPLETION, BUT IN NO CASE, LESS THAN FOLLOWING PERIOD; 1 YEAR <br />AFTER PROJECT COMPLETION. MAINTAIN TREES, SHRUBS, AND OTHER PLANTS BY PRUNING, CULTIVATING, AND WEEDING AS REQUIRED <br />FOR HEALTHY GROWTH. RESTORE PLANTING SAUCERS. TIGHTEN AND REPAIR STAKE AND GUY SUPPORTS AND RESET TREES AND <br />SHRUBS TO PROPER GRADES OR VERTICAL POSITION AS REQUIRED. RESTORE OR REPLACE DAMAGED WRAPPINGS. SPRAY AS <br />REQUIRED TO KEEP TREES AND SHRUBS FREE OF INSECTS AND DISEASE. REPLENISH MULCH TO THE REQUIRED DEPTH. MAINTAIN LAWNS <br />FOR 45 DAYS AFTER INSTALLING SOD INCLUDING MOWING WHEN SOD RECITES 4” IN HEIGHT. WEED PLANTING BEDS AND MULCH SAUCERS <br />AT MINIMUM ONCE A MONTH DURING THE GROWING SEASON. PROVIDE A MONTHLY REPORT TO THE OWNER ON WEEDING AND OTHER <br />MAINTENANCE RESPONSIBILITIES. <br />LANDSCAPE NOTES