My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10252022
StAnthony
>
City Council
>
City Council Packets
>
2022
>
CC PACKET 10252022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2022 3:15:48 PM
Creation date
10/20/2022 3:14:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER FUND <br />2022 <br />The 2022 street project included two stormwater projects: <br />An alley stormwater repair <br />The 15-year maintenance needs for the Foss Rd ditch system <br />Requests for bids have been published for the Harding Pond project <br />The $272,000 estimated project anticipates restoring the flooding capacity to the pond’s original design <br />Future <br />The Storm Water fund currently has a sufficient fund balance to support the scheduled replacement throughout 2022-2038 time-frame <br />Stormwater fund transfers have been used to support the debt levy reduction program as needed in prior years <br />The stormwater rates have been adjusted over time to support maintenance costs and capital needs <br />Continuing Stormwater fee rate management will ensure sustainability <br />112
The URL can be used to link to this page
Your browser does not support the video tag.