Laserfiche WebLink
STORMWATER FUND <br />2022 <br />The 2022 street project included two stormwater projects: <br />An alley stormwater repair <br />The 15-year maintenance needs for the Foss Rd ditch system <br />Requests for bids have been published for the Harding Pond project <br />The $272,000 estimated project anticipates restoring the flooding capacity to the pond’s original design <br />Future <br />The Storm Water fund currently has a sufficient fund balance to support the scheduled replacement throughout 2022-2038 time-frame <br />Stormwater fund transfers have been used to support the debt levy reduction program as needed in prior years <br />The stormwater rates have been adjusted over time to support maintenance costs and capital needs <br />Continuing Stormwater fee rate management will ensure sustainability <br />112