Laserfiche WebLink
<br />Total Valuation <br /> <br /> <br /> <br /> <br /> <br />Inspections for which no fee is specifically <br />indicated (minimum charge, 1/2 hour) <br /> <br />$765.00 per hour <br /> <br />Additional plan review required by changes, <br />additions, or revisions to plans (minimum <br />charge, 1/2 hour) <br /> <br />$10565.00 per hour <br /> <br />For use of outside consultants for plan checking <br />and inspections, or both <br /> <br /> <br /> <br />Actual costs** <br />Plan review 65% of Building Permit fee <br /> <br />NOTES TO TABLE: <br />* Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include <br />supervision, <br /> overhead, equipment, hourly wages, and fringe benefits of the employees involved. <br />** Actual costs include administrative and overhead costs. <br />A plan review fee of 65% of the permit fee will be charged for building permits which require the <br />submittal of plans. Fees for similar plans will be charged in accordance with provisions of Minn. Rules, <br />Chapter 1300.0160, subd. 5. <br /> <br /> <br />Plan Review when there is a Master Plan When <br />approved, the review fee shall not exceed 25% of <br />the permit fee for submittal documents reviewed <br />using a Master Plan set. <br /> •The review fee for a Master Plan set shall be 65% <br />of the permit fee <br />25% of Building Permit fee <br /> <br /> <br />Review of State Approved Construction <br />Documents <br /> 25% of Building Permit fee <br /> <br />Pre-Final inspection (new home or structure) <br /> <br /> $75.00 <br /> <br />Re-inspection <br />A re-inspection fee may be assessed: <br />•Each inspection or re-inspection when the work <br />for which the inspection was scheduled is not <br />complete at the time of the scheduled inspection. <br />For valuation-based building permits, this fee is <br />not assessed the first time an inspection fails, and <br />a re-inspection is required. <br />•When the address of the jobsite is not posted. <br />•When the inspection record card is not posted or <br />provided at the worksite. <br />•When the approved plans are not readily <br />available for the inspector. <br />•When access to conduct the inspection is not <br />provided. <br />•When the inspector is not met by the individual <br />responsible (no show). <br /> $65.00 <br /> <br />Formatted: Line spacing: single <br />Formatted Table