My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11222022
StAnthony
>
City Council
>
City Council Packets
>
2022
>
CC PACKET 11222022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2022 3:59:03 PM
Creation date
11/17/2022 3:57:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />HEATING, AIR CONDITIONING AND REFRIGERATION <br /> <br />Purpose of Fee <br /> <br />Amount <br /> <br /> Residential (R-1, R-1A, and R-2) <br /> <br /> <br /> <br /> Each dwelling unit (new construction)New appliances <br /> <br />$37.50 per appliance, $75 <br />minimum150 <br />Gas line only permit $75.00 includes all gas lines <br />Gas Fitting/Connection $50.00 (with a mechanical <br />permit/includes all gas <br />lines/fittings <br /> Fixture maintenanceOther (furnace, gas range, gas dryer, hot water heater, <br />air conditioner, gas piping, duct work, boiler, piping, hydronics systems, and <br />the like activity requires a regular mechanical permit) <br /> <br />$5030 <br /> <br /> Commercial, light industrial, and multi-family (C, LI, R-3,and R-4) <br /> <br /> <br /> <br /> All <br /> <br />3% of contract price <br /> <br /> Add $520 administrative fee and $.50 surcharge to all permits <br /> <br /> <br />Plan Review fee 65% of permit fee <br /> <br />Special Investigation <br />•Applicable when work was started prior to obtaining any permit <br />required by City Code. <br />•This fee is due at the discretion of the City Manager, regardless of <br />whether a permit is issued. <br />100% of Permit Fee, in addition to 100% of Permit Fee, in addition to <br />original fee amount. <br />Permit Renewal within 6 mos. of expiration (no plan changes, no code <br />changes, new permit number <br />50% of the original Permit Fee <br />Refunds & Fee Adjustments: <br />•Plan review <br />•Building Maintenance Permit Fee <br />•Permit Fee (work started) <br />•Permit Fee (permit processed & ready to issue) <br />•Permit Fee (work not started & within 6 months of permit issuance) <br /> <br /> <br /> <br />No refund <br />No refund <br />No refund <br />80% <br />60% <br />Inspections outside of normal business hours <br />• Includes travel time both ways <br />$75.00/hr. <br />$150.00 minimum <br />Inspections for which no fee is indicated <br />• Miscellaneous and Special Services <br />$75.00/hr. <br />$37.50 minimum <br /> <br />NOTES TO TABLE: <br />The minimum permit fee for commercial, industrial, institutional, or business occupancies is $20 plus state <br />permit fee surcharge. <br /> <br /> <br /> <br />Formatted Table <br />Formatted: Line spacing: single <br />Formatted: Space After: 0 pt <br />Formatted: Line spacing: single <br />Formatted Table
The URL can be used to link to this page
Your browser does not support the video tag.