Laserfiche WebLink
St. Anthony 2040 Comprehensive Plan Chapter 10: Implementation <br />7 <br /> <br /> Proposed functional classification change from local street <br />to Minor Collector on the roadways identified in the <br />Transportation Chapter of this Plan (Figure 6-14). <br />City staff <br /> Evaluate potential to add on-road bike lanes on 29th Ave <br />from Stinson Blvd to New Brighton Blvd. <br />City staff <br /> Evaluate potential for adding an on-road bicycle facility on <br />St. Anthony Boulevard between Stinson and Ridgway Pkwy. <br />City staff <br /> Evaluate adequacy of transit service in redevelopment <br />areas and support planned increased frequency on bus <br />routes 15 (formerly route 4), 25, 32, 801 within the City <br />Metro Transit, City staff <br /> Evaluate the potential to adjust Route 25 to remain on <br />Stinson Parkway and Stinson Blvd. between Kenzie Terrace <br />and 29th Street <br />Metro Transit, City staff <br /> Coordinate with Hennepin County and City of Minneapolis <br />regarding planned bikeway and sidewalk (on east side of <br />roadway between St. Anthony Blvd. and 37th Avenue). <br />Designate as RBTN alignment. <br />City staff, Hennepin <br />County, City of <br />Minneapolis <br /> <br /> Coordinate with Ramsey County regarding planned <br />bikeway along Silver Lake Road from Silver Lane to County <br />Road E; evaluate potential for multiuse trail connection to <br />Silverwood Park. <br />City staff, Ramsey County <br /> At railroad crossings on Stinson Blvd, coordinate with <br />Canadian Pacific Railroad to improve safety and operations <br />City staff