Laserfiche WebLink
1/12/2023 <br />6 <br />Interim Use Permits <br />•Just like a Conditional Use Permit, but with <br />a specific timeline attached. <br />•Expiration may be a date or an event. <br />•Should be accompanied by a written <br />statement of agreement from the applicant <br />verifying the expiration of the permit. <br />•New permits are new, technically not <br />“renewals” – there is no inherent right to <br />continue a use after the termination date. <br />Variances <br />•An approved variation to a (usually) dimensional <br />standard, such as a setback, or lot coverage, or <br />number parking spaces, etc. <br />•Requires a finding that there is a specific, unique <br />“practical difficulty” in putting the property to <br />what would otherwise be a reasonable way to <br />use the property. <br />•Designed to be somewhat difficult to get – there <br />is a presumption that the City’s general <br />ordinances do a thorough job of addressing the <br />most common conditions.