My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 06052023
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
2023
>
PK PACKET 06052023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 1:35:16 PM
Creation date
6/2/2023 1:26:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SALO PARK – SOUTH POND <br />Good Things: <br />• Green space and amphitheater used for summer concerts <br />Things to Address: <br />1. ADA issues with sidewalk <br />2. Other issues (not priori�zed): <br />1) Rusty railings <br />2) Cracks in cement wall (SW) <br />3) Broken light covers <br />4) Heaving sidewalk slabs <br />5) Dislodged bollard <br />6) Crumbling sidewalk <br />7) Sign missing leters <br /> <br />All of these repairs are in process. <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.