My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 06052023
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
2023
>
PK PACKET 06052023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 1:35:16 PM
Creation date
6/2/2023 1:26:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRILLIUM PARK <br />Things to Address: <br />1. Overgrown shrubs along entrance have scrub trees growing in <br />them. <br />2. Evergreen trees have scrub trees growing under them. <br />3. Entrance to park sign is weedy. (public works is planning <br />collabora�ve effort with Village Gardeners later this summer) <br />4. Several tree stumps have re-sprouted. <br />5. Raingarden is not large enough to accommodate the full area, <br />soggy lawn around the north and west sides of the garden. <br />Ideas to Consider: <br />1. Add weather control to water fountain to turn off in strong winds <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.