Laserfiche WebLink
Method for Selection - Reconstruction Projects•Flood Relief Effort•Existing Utility Deterioration•Pavement Condition•Adjacent Infrastructure Replacement (Construction Phasing)Method for Selection – Mill & Overlay Projects•Maintain and extend the life previously reconstructed roadwaysMethod for Selection – Thin Maintenance Overlays•A non-structural asphalt layer applied as a maintenance treatment for short-term corrective actionProposed CapitalImprovement Plan (CIP)