My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09122023
StAnthony
>
City Council
>
City Council Packets
>
2023
>
CC PACKET 09122023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2023 8:34:42 AM
Creation date
9/8/2023 8:26:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Construction permits inspections budgeted at an increasing baseline activity results <br />in greater expense of $5,211. This increase has no impact on the levy as the <br />inspection fee is a percentage of permit revenue received. <br />• Assessor, Attorney, Auditor, Engineer and Planner services reflect rate and activity <br />increases. The net result of these factors is cost impact of $16,500 <br />• Contracted Information Technology costs up $18,905. <br />• Miscellaneous service contracts are estimated to increase by $25,999. This is <br />driven by police and fire increases in contracted costs, election contract increase <br />due to the work load associated with 2024 Presidential election, and remaining <br />costs impacted by inflation. <br /> <br />• Other Insurance costs – 5.3% of expenditures, overall costs up by $114,862. <br />• The workman's compensation insurance experience rating declined by 24% in the <br />2023-2024 renewal period. This was substantially due to a police officer PTSD <br />claim. The cost impact of the rating decline is approximately $77,940. <br />• The coverage rates improved slightly in the 23/24 policy renewal. However, the <br />increase in covered wages produced an additional coverage cost of $44,068. <br />• These factors equate to a 17.2% increase cost for 2024 which was comparable to the <br />prior renewal increase of 17.4%. <br />• The PTSD claim will continue to keep our insurance costs at a higher level for the <br />next two renewal cycles. <br />• Liability, Property and Casualty premiums are projected to decline by $7,145 in <br />2024. <br /> <br /> <br />• Pass through costs – 2.3% of expenditures, costs up $10,250. <br />• The substantial portion of the increase represents an $15,000 increase in the rent <br />transfer to the City Hall/Community Center Fund offset by various reductions in <br />other pass through items. <br /> <br />• Remaining budget line items – 12.1% of overall expenditures or $1,134,142, costs are up <br />$67,030. <br />• Energy costs make up $17,979 of this increase. <br />• Then anticipated inflationary factors have been applied to many of the supplies, <br />printing, and repair and maintenance services pushing these costs up by $26,742. <br />• Budgeted costs for communications, community inclusion and sustainability <br />initiatives and other miscellaneous items are up $22,309 compared to 2023. <br /> <br /> <br />General Fund Revenues: <br /> <br />• Liquor transfer to the General Fund will be $275,000 same as 2023. <br />• 2024 State funded Local Government Aid reflects an increase of $64,472. <br />• Police contracted services has increased by $123,455, a 14.35% increase. <br />• Excess Tax Increment collections are projected to increase by $77,000 in 2024. <br />. <br /> <br />The 2024 HRA Budget and Levy is proposed at the same amount as 2023, 0% Levy increase. <br /> <br />The 2024 Debt Related Levies and Street improvement Levies are proposed to increase by <br />$0 over the 2023 combined debt levies. The 2024 Street project includes the extensive mill and <br />21
The URL can be used to link to this page
Your browser does not support the video tag.