My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09122023
StAnthony
>
City Council
>
City Council Packets
>
2023
>
CC PACKET 09122023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2023 8:34:42 AM
Creation date
9/8/2023 8:26:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feasibility Report <br />2024 Street Improvement Project <br />City of St. Anthony Village <br />WSB Project No. 023088-000 Page 1 <br />1. Executive Summary <br />The 2024 Street Improvement Project consists of the bituminous mill and overlay of the following <br />roadways: <br />•Roosevelt Street Northeast from 37th Avenue Northeast to 34th Avenue Northeast <br />•Edward Street Northeast from 35th Avenue Northeast to 34th Avenue Northeast <br />•Harding Street Northeast from 36th Avenue Northeast to 34th Avenue Northeast <br />•35th Avenue Northeast from Stinson Boulevard to Harding Street Northeast <br />•34th Street Northeast from Stinson Boulevard to Silver Lake Road <br />•Roosevelt Court from 33rd Avenue Northeast to the cul-de-sac <br />•Belden Drive from 34th Avenue Northeast to 33rd Avenue Northeast <br />•Roosevelt Street Northeast from 33rd Avenue Northeast to 31st Avenue Northeast <br />•Edward Street Northeast from 33rd Avenue Northeast to 31st Avenue Northeast <br />•Wilson Street Northeast from 32nd Avenue Northeast to 30th Avenue Northeast <br />•Belden Drive from 33rd Avenue Northeast to 32nd Avenue Northeast <br />•Harding Street Northeast from 31st Avenue Northeast to 30th Avenue Northeast <br />•Hilldale Avenue Northeast from Belden Drive to Silver Lake Road <br />•32nd Avenue Northeast from Edward Street Northeast to Silver Lake Road <br />•Townview Avenue from Wilson Street Northeast to Silver Lake Road <br />•31st Avenue Northeast from Stinson Boulevard to Silver Lake Road <br />•Saint Anthony Road from Roosevelt Street Northeast to Edward Street Northeast <br />•Hilldale Avenue Northeast from Silver Lake Road to Rankin Road <br />•32nd Avenue Northeast from Silver Lake Road to Rankin Road <br />A map illustrating the project locations can be found on Figure 1 in Appendix A. <br />The total estimated project cost for the 2024 Street Improvement Project is approximately $2.43 million. <br />Funding for the project will come from the City’s Street and Utility Reconstruction Funds (Public <br />Improvement Bonds) and Special Assessments to benefiting properties. <br />The 2024 Street Improvement Project can be completed including the final lift of bituminous paving and <br />all restoration items, in 2024. <br />This project is feasible, necessary, and cost effective from an engineering standpoint and should be <br />constructed as proposed herein. <br />66
The URL can be used to link to this page
Your browser does not support the video tag.