Laserfiche WebLink
<br />Project Scope: <br /> <br />Please note, installation is based on site being ready prior to our arrival to install play equipment as well as site conditions that have been conveyed <br />to our organization by the owner/owner's representative and/or ideal conditions existing for a timely completion of your project as quoted. Unless <br />addressed prior to the installation quote being issued or specifically mentioned herein, any issues that arise that impede the progress/completion of <br />your project as quoted will result in additional charges. <br /> <br />Weather can change project scheduling in many ways. Take rain for an example. Day, or days, before rain... If weather forecasts show a high <br />percentage chance for rain that will effect the site conditions, a postponement may be in order. Digging holes, laying certain surfacing materials, <br />etc., are greatly affected by weather conditions and work may not begin/continue due to weather forecasts. There's the rain days themselves, which <br />if heavy enough rainfall occurs, makes a site unworkable. Day, or days, after rain... Drying time will be needed after rain and the number of days <br />needed will vary depending on amount of moisture received. One actual rain day may equal multiple delay days depending on work scheduled to <br />be done. <br />+ INCLUSIONS + <br />+ One mobilization <br />+ Public utility locates only <br />+ Installation of equipment as outlined on quote # 103876-01-03 <br />+ Marking and digging of footings holes to accept direct embedment supports as needed <br />+ Unpacking of play equipment <br />+ Assembly of play equipment <br />+ Concrete for footings as needed <br />+ Pouring of concrete for footings <br />+ Engineered wood fiber (EWF) surfacing <br />+ Spreading of EWF <br />+ Construction tape/temporary bracing (as needed) <br />+ Standard insurance offerings <br />+ Standard warranty offerings <br />+ Standard industry accepted labor wages <br />+ Site work such as excavation of site, grading, pouring, and forming concrete border <br />+ Border to help contain playground safety surfacing <br />+ Disposal of packing material <br />+ Poured-In-Place safety surfacing <br /> <br />- EXCLUSIONS - <br />- Clear access path up to and into play area for installation equipment (minimum of 8-foot wide, includes but not limited to gates, walkways, <br />driveways, etc.) <br />- Staging area for materials and installation equipment, trailers, etc. <br />- Unobstructed space for maneuvering installation equipment as well as performing work <br />- Security fencing of any type <br />- On site security personnel <br />- If fencing is in place (by others), ability to unlock fencing is to be provided to our office a minimum of one week prior to our start <br />- Private utility locates such as, but not limited to, irrigation, fiber optics, private lighting, etc. <br />- Accepting, unloading and storage of order(s)/shipment(s) prior to installation. Please note, orders can be packaged/shipped in large crates, <br />pallets, etc., requiring heavy-duty equipment to unload. <br />- Removal of existing play equipment, border, safety surfacing, etc. <br />- Backfill and compaction of backfill after removal of existing items (for footing holes as an example) that leave voids in area (marking and digging of <br />new footing holes based on workable site) <br />- Digging in compacted sub-surfaces, rock, hard pan, tree roots, unstable soil conditions, etc. <br />- Restoration of compacted sub-surfaces for playground surfacings such as, but not limited to, poured-in-place rubber, rubber tiles, artificial turf, etc. <br />- Digging/maneuvering in sand, pea gravel, mud, etc. <br />- Offsite removal of spoils from footing holes (can be stockpiled near play area for owner/owner's representative removal or spread within play area) <br />- Removal of temporary braces, caution/construction tape, etc. (Can be removed and disposed of after concrete has cured.) <br />- Bonding of any type <br />Minnesota / Wisconsin Playground <br />5101 Highway 55, Suite 6000 <br />Golden Valley, Minnesota 55422 <br />Ph. 800-622-5425 | 763-546-7787 <br />Fax 763-546-5050 | jong@mnwiplay.com <br /> <br />CONSULTANT: JON GILBERTSON <br />08/08/2023 <br />Quote # <br />103876-01-04 <br />Silver Point Park - St. Anthony, MN - D11864G - I <br />Page 3 of 6