My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 Capital Funds book
StAnthony
>
Finance
>
Capital Funds
>
2023 Capital Funds book
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 11:08:00 AM
Creation date
10/10/2023 11:07:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Fire <br />• The Fire department’s 2023 replacement of self-contained breathing apparatus (SCBA) <br />equipment was estimated at $277,200 in last year’s CIP budget. The replacement cost has <br />been lowered to $218,700 in this years CIP. The cost reduction was achieved by the <br />department’s participation in fire services JPA. <br /> <br />Public Works <br /> <br />• Public Works – Streets Division: In 2023 fleet replacements Ford F150 Electric truck. Significant <br />purchases for replacing the 1995 plow truck and the 2008 aerial truck are reflected as <br />occurring in 2024-2027. The priority and timing of these purchases will be evaluated year to <br />year. <br /> <br />• Public Works – Parks Division: In 2023 significant replacements will be the multi-use Tool Cat <br />5600 at an estimated cost of $74,000 and a Toro Groundmaster 360 mower at an estimated <br />cost of $45,744. These two pieces of equipment are heavily used. The 2023 replacement of a <br />John Deere 4500 Tractor has been rescheduled to 2026 as the tractor is in reasonable <br />condition. <br /> <br />Admin. and Finance <br /> <br />• Administration and Finance – 2023 costs include replacing the majority of desktop and laptop <br />computers not replaced in 2022 and the cost of recodification of the city code and the web <br />hosting of the same. Purchases for election equipment, office furniture and additional <br />financial software are slated for 2024-2026. The priority and timing of these replacements will <br />be evaluated year to year. <br /> <br />Future considerations for Capital Improvement Fund: <br /> <br />• Phasing out the use of Infrastructure transfers as a CIP source and converting that amount to <br />levy. Then available Infrastructure dollars would reallocated to the debt levy reduction to <br />negate levy impact. Targeting 2024 CIP process to review and possibly implement this <br />change. <br /> <br /> <br />Parks Improvement Fund <br /> <br /> <br />• The results of the WSB Parks Evaluation study will inform the items and timing of future <br />capital expenditures. <br />• Present needs included for 2023 are: <br />• $10,000 to repair Skateboard park for surface safety issue. <br />• A placeholder for the potential repair or replacement of Silverpoint park playground <br />equipment has been added for the Parks Commission’s review. The placeholder <br />included is the full replacement option, less costly options will also be evaluated.
The URL can be used to link to this page
Your browser does not support the video tag.