My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 12122023
StAnthony
>
City Council
>
City Council Packets
>
2023
>
CC PACKET 12122023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 8:17:19 AM
Creation date
12/8/2023 8:15:25 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />K:\022209-000\Admin\Construction Admin\Bidding\022209-000 LOR120423.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM December 4, 2023 <br /> <br /> <br /> <br />Honorable Mayor and City Council <br />City of St. Anthony Village <br />3301 Silver Lake Road, <br />St. Anthony, MN 55418 <br /> <br />Re: Well No. 4 Rehabilitation <br /> City of St. Anthony Village, MN <br />WSB Project No. 022209-000 <br /> <br /> <br />Dear Mayor and Council Members: <br /> <br />Quotes were received for the above-referenced project on Wednesday, November 8, 2023. <br />Three quotes were received. The quotes were checked for mathematical accuracy. Please find <br />enclosed the bid summary indicating the low bid as submitted by Keys Well Drilling Company, St. <br />Paul, MN in the amount of $98,830.00 for the Base Bid. The Engineer’s Estimate was <br />$133,230.00 for the base bid. <br /> <br />In addition, costs were requested for two alternate items as follows: Key’s Quote <br /> Alternate No. 1 – New Pump Bowl Assembly $13,000 <br /> Alternate No. 2 – Well Maintenance Work $83,000 <br /> <br />It should be noted that Alternates No. 1 & No. 2 are items that may or may not be required to <br />complete the well rehabilitation. The need for Alternates No. 1 & No. 2 will be determined <br />following removal and inspection of the pump and casing during the construction process. It <br />should also be noted that if Alternate No. 1 & No. 2 are determined necessary approximately <br />$38,580 in Base Bid items would be eliminated as they would no longer be necessary thereby <br />resulting in an estimated maximum total project cost of $156,250. <br /> <br />We recommend that the City Council consider these Quotes and award a contract for the base <br />bid in the amount of $98,830.00 to Keys Well Drilling Company based on the results of the bids <br />received. Alternates should be awarded as determined necessary upon inspection. <br /> <br />If you have any questions, I will be present at the December 12, 2023, Council Meeting to discuss <br />those with you or please call me at 612-388-9652. <br /> <br />Sincerely, <br /> <br />WSB <br /> <br /> <br /> <br />Justin Messner, PE <br />City Engineer <br /> <br />Attachments <br /> <br />kkp <br />183
The URL can be used to link to this page
Your browser does not support the video tag.