Laserfiche WebLink
City Council Regular Meeting Minutes <br />November 28, 2023 <br />Page 3 <br />1 Mr. Messner reviewed the method for selection for Reconstruction Projects includes flood relief <br />2 effort, existing utility deterioration, pavement condition and adjacent infrastructure replacement <br />3 (construction phasing). The method for selection of Mill & Overlay Projects is to maintain and <br />4 extend the life previously reconstructed roadways. The method for selection of Thin <br />5 Maintenance Overlays is a non-structural asphalt layer applied as a maintenance treatment for <br />6 short-term corrective action. <br />7 <br />8 A list of the locations for the proposed mill and overlay project was provided. The proposed thin <br />9 maintenance overlay will be on 31st Avenue NE (Silver Lake Road to Rankin Road). The <br />10 concrete work at Salo Park will replace cracked panels. The total cost for the proposed <br />11 improvements is estimated to be $2,667,600. A map showing the assessed parcels was provided. <br />12 <br />13 For Silver Point Park the parking lot mill and overlay, reclaim and pave the trail, replace <br />14 cracked panels in the concrete and remove and replace the basketball court. These improvements <br />15 were included with the bid package for cost information and future Council consideration. <br />16 <br />17 Mr. Messner reviewed the project schedule with substantial completion being done in September <br />18 2024. Photographs were provided for Council review. <br />19 <br />20 Residents can sign up to receive email and/or text message project status updates by visiting the <br />21 project webpage located under Government / Projects on the City’s website at <br />22 https://savmn.com. Additional information regarding street reconstruction projects for the City of <br />23 St. Anthony can be found by visiting the St. Anthony Village Reconstruction Process webpage <br />24 located under How do I . . . /Learn About on the City’s website. <br />25 <br />26 Councilmember Webster asked since Salo Park is not on City property, but there is a <br />27 maintenance agreement in place. Mr. Messner stated the agreement includes the City assuming <br />28 maintenance of the area. Mr. Yunker stated the funds come from the stormwater fund. <br />29 <br />30 Councilmember Jenson referred to Silver Point Park and asked when that will be completed, and <br />31 Mr. Messner stated nothing is planned at this time but was included in the facilities maintenance <br />32 study. The playground replacement project is still going forward. <br />33 <br />34 Mayor Stille stated the street maintenance plan makes sense. <br />35 <br />36 Motion by Councilmember Jenson, seconded by Councilmember Walker, for approval of <br />37 Resolution 23-063 – Accepting Plans and Specifications and Ordering Advertisement for Bids <br />38 for the 2024 Street Improvement Project. <br />39 <br />40 Motion carried 4-0. <br />41 <br />C.42 Resolution 23-064 – Ratifying the 2024 Agreement Between the International <br />43 Association of Fire Fighters, Local 3486 Representing the St. Anthony Fire Department <br />44 Employees and the City of St. Anthony Village. <br />45 <br />9