My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WS PACKET 01092024
StAnthony
>
City Council
>
City Council Work Session
>
2024
>
CC WS PACKET 01092024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2024 10:53:06 AM
Creation date
1/5/2024 10:51:18 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARKS <br />The City Parks Division maintains a total of six <br />primary parks (Emerald, Central, Tower, Salo, <br />Silver Point, and Trillium). In addition, the Parks <br />Division maintains the City's ice skating rinks, <br />which are open from about December through <br />February, weather dependent. <br />11 <br />ENGINEERING <br />WSB <br />JUSTIN MESSNER <br />The City Engineer is WSB & Associates. They have <br />served in this capacity with the City since 1996. <br />The role of the City Engineer is to: <br />Prepare feasibility studies <br />Make recommendations on infrastructure <br />needs <br />Prepare construction plans and specifications <br />Solicit bids <br /> Prepare assessments <br />Manage construction and contracts <br />Current priorities include: <br />Street and Utility Reconstruction Program <br />Flood reduction <br />Sustainability efforts
The URL can be used to link to this page
Your browser does not support the video tag.