Laserfiche WebLink
7 <br />Engineering Division Projects <br />2023 <br />Harding Pond Restoration <br />◦Located between Silver Lake Rd & Harding St <br />and 30th Ave & 31 st Ave <br />◦Approximately 2,500 cubic yards of sediment <br />removed <br />◦Stormwater retention capacity improved from <br />1’ average depth to 3’ average depth <br />◦Invasive vegetation removed <br />◦Storm sewer pipe and drainage structure <br />improvements <br />Engineering Division Projects <br />2023 <br />Reclamite <br />◦Pavement rejuvenation process <br />◦Improves the asphalt’s durability, flexibility, <br />and viscosity <br />◦The product is sprayed on the road surface <br />with a distributor truck and covered with sand <br />◦The sand is swept up the following day <br />◦32nd Ave, Croft Dr, Macalaster Dr, Foss Rd, <br />Highcrest Rd, Silver Ln, and Silver Lake Terr <br />31