Laserfiche WebLink
6/5/2024 <br />1 <br />2025 STREET AND UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING <br />June 11, 2024 <br />CURRENT CAPITALIMPROVEMENT PLAN (CIP) <br />Method for Selection ‐Reconstruction Projects <br />•Flood Relief Effort <br />•Existing Utility Deterioration <br />•Pavement Condition <br />•Adjacent Infrastructure Replacement (Construction  <br />Phasing) <br />Method for Selection – Mill & Overlay Projects <br />•Maintain and extend the life previously reconstructed  <br />roadways <br />Method for Selection – Thin Maintenance Overlays <br />•A non‐structural asphalt layer applied as a maintenance  <br />treatment for short‐term corrective action <br />36