Laserfiche WebLink
Grand Rounds Missing Link <br />Prioritization Criteria of Segments <br />Updated May 16, 2024 <br /> <br />Inspired by Trail Design Criteria: <br />1. Feasible <br />Is there a funding match or interest from partners in applying for grants to match MPRB <br />funding? <br />2. A vision founded on interagency coordination : <br />Is there alignment with partner agency CIPs and design or construction timing? <br />Is there political alignment including elected and agency support? Does the trail concept align <br />with partner agency plans? <br />3. MPRB parkway typology wherever possible <br />Is it a complex engineering challenge that would impact cost and feasibility? <br />Is there option for MPRB site control through land ownership, easement, or acquisition? <br />4. Connect the river to St. Anthony Parkway <br />How do you bring park space to the corridor and increase ecological and recreational access? <br />5. Consider importance of industry to the city <br />6. Mitigate environmental justice challenges in industrial areas and corridors near freeways <br />Does the route bring more recreational and ecological features to the industrial <br />neighborhoods? <br />7. Be an asset to the neighborhoods through which it passes