My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WS PACKET 09172024- Joint with PL and PK Commissions
StAnthony
>
City Council
>
City Council Work Session
>
2024
>
CC WS PACKET 09172024- Joint with PL and PK Commissions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 1:51:14 PM
Creation date
9/13/2024 1:50:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ROUTE DESIGN CONSIDERATIONS <br />The 2019 community’s Route Considerations guide development of the trail along with the routes. The design <br />process will focus on these considerations along the proposed routes: <br />1.Feasible <br />2.A vision founded on <br />interagency coordination <br />3.MPRB parkway typology <br />wherever possible <br />4.Connect the river to St. <br />Anthony Parkway <br />5.Consider importance of <br />industry to the city <br />6.Mitigate environmental <br />justice challenges in <br />industrial areas and <br />corridors near freeways <br />7.Be an asset to the <br />neighborhoods through <br />which it passes <br />8.Be a safe route for all users <br />9.Regional trail connections to <br />public transportation <br />GRAND ROUNDS MISSING LINK 5
The URL can be used to link to this page
Your browser does not support the video tag.