Laserfiche WebLink
Clean Energy Project Agreement <br />1264 Energy Lane <br />Saint Paul, MN 55108 <br />800.620.3370 <br />AllEnergySolar.com <br />4 <br /> <br /> <br />60 <br /> <br />days once work has commenced due to acts or omissions of Customer, Contractor will have the option to require a Change <br />Order is executed to account for any additional costs or changes to the construction schedules or may in its sole discretion <br />cancel this Contract. As the clean energy industry is frequently dependent on suppliers’ manufacturing capacity and <br />deliveries to the United States at the time immediately prior to installation, minor variations in parts due to substitutions of <br />like product will result in invoices being adjusted accordingly. For purposes of this Contract, the term “like product” means <br />products of like quality and price-performance to the equipment specified. <br />17.3. Attachments. The following are incorporated by reference to this Contract: Scope of Work; List of Work Exclusions; <br />Payment Schedules; and, if applicable, State-Specific Terms & Conditions. <br />18. Insurance Coverage. Contractor carries workers compensation insurance as required by law and commercial general liability <br />insurance. Upon request by Customer, Contractor shall provide Customer with a certificate of insurance verifying such coverage. <br />19. Title to Equipment and Right to Remove. Title to the equipment and materials supplied by Contractor will remain with <br />Contractor and not pass to Customer until all sums due Contractor have been paid. Contractor may, at its option, remove any <br />portion of materials equivalent in value to any payment required hereunder and not paid within sixty (60) days after receipt of <br />proper invoices thereunder without limiting Contractor’s rights herein. <br />20. Risk of Loss. Customer shall assume the risk of loss for all materials and equipment which are to be included in Contractor’s <br />work hereunder at such time as the materials and equipment are attached to the Property. <br />21. Cleanup. Contractor shall keep the project free from accumulation of debris, waste materials, or rubbish caused by its operations. <br />On completion of the work, Contractor will remove all debris, waste materials, rubbish, and surplus material brought on the <br />Property by Contractor from Customer’s property. <br />22. Limited Warranty. <br />22.1. Limited Warranty – Repair or Replacement. Contractor warrants the Clean Energy Project against defective <br />workmanship for the following period [ 60 ] months. This warranty provides for no-cost repair or replacement of the <br />Clean Energy Project to the extent the problems requiring replacement or repair results from defects in Contractor’s services <br />under this Contract. Defects in workmanship or otherwise related to or arising from specific equipment within the Clean <br />Energy Project manufactured by third parties are excluded from Contractor’s warranty obligations. Contractor shal l make <br />available to Customer all warranty documents relative to the equipment and materials incorporated in the Clean Energy <br />Project as provided by the applicable manufacturers. If requested by Customer, Contractor will act as the warranty <br />administrator for such manufacturer warranties and will, on a reasonable compensation basis, provide support for <br />Customer in pursuing any manufacturer warranty claims. Repair or replacement as provided under Contractor’s <br />workmanship warranty is the exclusive remedy of Customer against Contractor for defects in workmanship. The <br />workmanship warranty period will not be extended, nor will a new warranty period begin, upon any repair or replacement <br />performed by Contractor under this warranty. <br />22.2. Exclusions. This limited warranty excludes the following conditions: (i) failure to properly operate or maintain the Clean <br />Energy Project in accordance with printed instructions provided with the Clean Energy Project; (ii) any repair or <br />replacement using a part or service not provided or authorized in writing by Contractor; (iii) damages caused by, in <br />Contractor’s judgment, Customer or third party abuse, accident, alteration, improper maintenance or installation, pre - <br />existing roof conditions, removal by anyone other than Contractor or an authorized Contractor representative, misuse, <br />negligence or vandalism, riots, animal damage, or environmental pollution such as soot, salt damage, acid rain, earthquake, <br />fire, flood, extreme weather conditions such as high wind or frozen water buildup, or other acts of God or other unforeseen <br />conditions that are beyond Contractor’s control; (iv) Clean Energy Projects with the type or serial number(s) altered, <br />removed, or illegible; and (v) cosmetic defects, such as discoloration or scratches, caused by normal wear and tear. <br />Contractor’s Limited Warranty for defective workmanship does not guarantee a specific power output or, if applicable, <br />storage or charging capacity from the Clean Energy Project or guarantee Customer any return on investment in the Clean <br />Energy Project.