Laserfiche WebLink
Clean Energy Project Agreement <br />1264 Energy Lane <br />Saint Paul, MN 55108 <br />800.620.3370 <br />AllEnergySolar.com <br />7 <br /> <br /> <br /> <br />ATTACHMENT A <br />SCOPE OF WORK <br /> <br />Description of Installation: <br /> <br /> <br />Description <br /> <br /> <br />Equipment to be used: (Panels, Inverters, Racking, Monitoring, Storage, EV Charger, as applicable to the Project) <br /> <br />Product Specifications <br /> Description Quantity <br />Solar Panel <br />Inverter <br />Racking <br />Monitoring <br />Energy Storage <br />EV Charger <br />Other <br />All Energy Solar will provide all of the comprehensive and turnkey services to furnish the complete <br />design, installation, commissioning and long term reactive maintenance and support of the proposed <br />Solar PV System for the City of St. Anthony Village Public Works Building without the use of third <br />parties or subcontractors. This installation will be supported by experienced project managers, <br />NABCEP-Certified installers and master, journeyman, and apprentice electricians. This flat roof <br />installation will follow follow a standard, attachment-free ballasted racking design on the indicated <br />portions of the site roof utilizing the equipment outlined in the section below. <br />Jinko 580W 89 <br />SolarEdge 1 <br />UNIRAC Flat Roof Mount