My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11122024
StAnthony
>
City Council
>
City Council Packets
>
2024
>
CC PACKET 11122024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 4:36:49 PM
Creation date
11/12/2024 8:42:09 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/7/2024 <br />7 <br />UTILITIES INFRASTRUCTURE FUND <br />2024: <br />o replacement dehumidifier for the GAC plant <br />o Completion of Well No. 4 Pump restoration project <br />o Replacement of Sodium Permanganate Pumps and chemical <br />feed tubes <br />o Ford Lightning EV replaced a 2007 pick-up <br />o M2 Water Tanker/Flusher <br />o Water and sewer operating fund transfers to Utilities <br />Infrastructure Fund begin in 2024 to support future <br />infrastructure costs <br />2025: <br />o Plant Components Assessment of water treatment <br />plants recommended to assist in estimating timing <br />and expense associated with future repair and <br />maintenance items <br />o Funds earmarked for Wellhead Protection Plan <br />Review and Amendment (MDH) required every 10 <br />years <br />STORMWATER FUND <br />SOURCES <br />▪Stormwater fees <br />▪Watershed grants <br />& cost sharing <br />USES <br />▪Permitting (MS4) & <br />agency reporting <br />▪Engineering studies <br />▪Stormwater pond <br />maintenance <br />▪Flood improvements <br />▪Water quality activities <br />▪Equipment
The URL can be used to link to this page
Your browser does not support the video tag.