Laserfiche WebLink
11/7/2024 <br />9 <br />2025 Mill and Overlay Project <br />Maintenance and Resurfacing Project <br />The 2025 Street and Utility Improvement Project includes <br />asphalt resurfacing (mill and overlay) improvements along <br />the following roadways: <br />•39th Ave. NE:Stinson Blvd. to Silver Lake Rd. <br />•30th Ave. NE: Stinson Blvd. to Silver Lake Rd. <br />•Armour Terrace:Roosevelt St. to Silver Lake Rd. <br />•Murray Ave: Roosevelt St. to Coolidge St. <br />•29th Ave. NE: Silver Lake Rd. to Highway 88 <br />•Roosevelt St: St. Anthony Blvd. to 30th Ave. NE <br />•Wilson St: St. Anthony Blvd. to 30th Ave. NE <br />•Coolidge St: St. Anthony Blvd. to 29th Ave. NE <br />•Anthony Lane: 29th Ave. NE to Cul-de-Sac <br />2025 Street & Utility Reconstruction <br />•Macalaster Drive from 39th Ave <br />to Railroad <br />Location