Laserfiche WebLink
CURRENT CAPITAL <br />IMPROVEMENT PLAN (CIP) <br />Method for Selection -Reconstruction Projects <br />•Flood Relief Effort <br />•Existing Utility Deterioration <br />•Pavement Condition <br />•Adjacent Infrastructure Replacement (Construction <br />Phasing) <br />Method for Selection –Mill & Overlay Projects <br />•Maintain and extend the life previously reconstructed <br />roadways <br />Method for Selection –Thin Maintenance Overlays <br />•A non-structural asphalt layer applied as a maintenance <br />treatment for short-term corrective action <br />86