Laserfiche WebLink
1/16/2025 <br />23 <br />Interim Use Permits <br />•Just like a Conditional Use Permit, but with a specific <br />timeline attached. <br />•Expiration may be a date or an event. <br />•Should be accompanied by a written statement of <br />agreement from the applicant verifying the expiration of <br />the permit. <br />•New permits are new, technically not “renewals” – there is <br />no inherent right to continue a use after the termination <br />date. <br />Variances <br />•An approved variation to a (usually) dimensional standard, such as a <br />setback, or lot coverage, or number parking spaces, etc. <br />•Requires a finding that there is a specific, unique “practical difficulty” <br />in putting the property to what would otherwise be a reasonable way <br />to use the property. <br />•Designed to be somewhat difficult to get – there is a presumption <br />that the City’s general ordinances do a thorough job of addressing <br />the most common conditions.