Laserfiche WebLink
2 <br />Future Street & Utility <br />Reconstruction <br />Re-evaluated Annually <br />Method for Selection – Reconstruction Projects <br />•Flood Relief Effort <br />•Existing Utility Deterioration <br />•Pavement Condition <br />•Adjacent Infrastructure Replacement <br />(Construction Phasing) <br />Method for Selection – Mill and Overlay <br />Projects <br />•Maintain and extend the pavement life of <br />previously reconstructed roadways <br />Method for Selection – This Maintenance <br />Overlay Projects <br />•A non-structural asphalt layer applied as a <br />maintenance treatment for short-term corrective <br />action. <br />Future Street & Utility <br />Reconstruction <br />Re-evaluated Annually <br />2025 Mill & Overlay Project <br />39th Avenue NE <br />(Stinson Boulevard to Silver Lake Road) <br />29th Avenue NE <br />(Silver Lake Road to Rankin Road) <br />Wilson Street <br />(27th Avenue NE to 30th Avenue NE) <br />W Armour Terrace <br />(Roosevelt Street to Silver Lake Road) <br />30th Avenue NE <br />(Stinson Boulevard to Silver Lake Road) <br />Murray Avenue <br />(Roosevelt Street to Coolidge Street) <br />Coolidge Street <br />(St. Anthony Blvdto 29th Avenue NE) <br />Roosevelt Street <br />(St. Anthony Blvd to 30th Avenue) <br />2025 Street and Utility Improvement Project <br />Macalaster Drive <br />(South terminus to 39th Avenue NE) <br />3 <br />4