Laserfiche WebLink
7 <br />Surface Water Quality & Flood Control <br />Improvements <br />1. Silver Lake Water Quality <br />Management Plan <br />•In-Lake Alum Treatment <br />•Delta Dredging <br />•Invasive Vegetation <br />Management <br />•Carp Removal <br />•Native Aquatic Vegetation <br />Planting <br />2. Industrial Park Flood <br />Improvement <br />3. Mirror Lake Outfall <br />Improvements to Be Completed <br />in the Spring 2025 <br />•Replacement of existing metal outlet <br />with reinforced concrete and <br />installation of new manhole for <br />future maintenance <br />Emerald Ash Borer (EAB) Program <br />1. EAB first found in Minnesota <br />in 2009 <br />2. City wide inventory of trees <br />•Green Ash accounting for 7.5% <br />of trees within City right-of- <br />way and property <br />•More than 50% of inventoried <br />ash trees identified to be <br />preserved Next Steps: <br />•review dead/dying trees to <br />determine removal priorities <br />•Public outreach and education <br />13 <br />14