My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC MINUTES 12102024
StAnthony
>
City Council
>
City Council Minutes
>
2024
>
CC MINUTES 12102024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 4:02:29 PM
Creation date
1/29/2025 4:02:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br />December 10, 2024 <br />Page 4 <br />1 Councilmember Randle asked about Macalester to 391 to the Railroad and how many homes <br />2 were affected by the raw sewage backup. City Engineer Messner stated there were several <br />3 apartment units (6) on the first floor that were affected. <br />4 <br />5 Councilmember Elnagdy referred to the crosswalk on 30, noting it mentioned flashing lights. <br />6 She asked if the current lighting would be replaced and if so, could that happen before June. Ms. <br />7 Koscielak stated it likely would not happen before June. She stated the signage can be added to <br />8 the contract to be done earlier. Councilmember Elnagdy stated the current lights are inefficient. <br />9 Mr. Messner stated he will have public works look at the existing signs. <br />10 <br />11 Councilmember Jenson stated he appreciates the detail of the presentation. He likes the RFQ's <br />12 can go out in January. <br />13 <br />14 Councilmember Doolan stated she appreciates the presentation. She asked about the light overlay <br />15 on St. Anthony Lane. She asked how long the temporary overlay will get us through before a <br />16 complete reconstruction is needed to be done. Ms. Koscielak stated generally five years however <br />17 possibly some pothole filling can be done. Councilmember Doolan asked if next year's mill and <br />18 overlay will be for approximately the same size. Ms. Koscielak stated it will be less of an area. It <br />19 should be able to be completed in one phase. <br />20 <br />21 Mayor Webster thanked Ms. Koscielak and Mr. Messner for their presentation. <br />22 <br />23 Motion by Councilmember Jenson, seconded by Councilmember Doolan, to approve Resolution <br />24 24-093 — Resolution Accepting Plans and Specifications and Ordering Advertisement for Bids <br />25 for the 2025 Street and Utility Improvement Project. <br />26 <br />27 Motion carried 5-0. <br />28 <br />29 B. Ordinance 2024-07 — Amending Multiple Sections of Chapter 33 Sewer Water License <br />30 and Permit Fees Storm Water Facilities — Final Reading. <br />31 <br />32 Finance Director Deborah Maloney reviewed a PowerPoint of Utility Rates for 2025. <br />33 <br />34 The parameters are to align revenue sources with corresponding costs, provide transparency as to <br />35 the basis of rates and rate adjustments, maintain a structurally balanced operation, and ensure <br />36 that rates appropriately support the ability to provide safe drinking water, properly discharge <br />37 sanitary sewer flows, and appropriate control and treatment of storm water runoff. <br />38 <br />39 Water Fund expenditures are comprised of two primary operating functions. Production <br />40 $1,038,888 and Distribution $875,593. The current recommendation includes continuing the <br />41 phase -in of a quarterly fee to support distribution system costs. The quarterly Water Distribution <br />42 Fee will increase by $1.50. For the Adjustment in Usage Rates the current recommendation <br />43 includes the water usage tier rates increases will range from 12-20 cents per 1,000 gallons in <br />44 2025. Water consumption for 2025 is projected at a similar level to 2024. Mr. Yunker reviewed <br />45 the adjustment impacts. <br />46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.