My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 03182025
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2025
>
PL PACKET 03182025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 9:49:57 AM
Creation date
3/14/2025 9:48:06 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MSE 24-hr 3 Rainfall=4.24"10-Yr Exist <br />Prepared by Schultz Engineering And Site Design <br />Page 5HydroCAD® 10.10-4b s/n 11475 © 2020 HydroCAD Software Solutions LLC <br />Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points <br />Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. <br />Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method <br />Runoff Area=0.824 ac 5.22% Impervious Runoff Depth>1.75"Subcatchment EXIST1: <br /> Tc=5.0 min CN=72/98 Runoff=2.60 cfs 0.120 af <br />Runoff Area=0.029 ac 0.00% Impervious Runoff Depth>1.77"Subcatchment EXIST2: <br /> Tc=5.0 min CN=74/0 Runoff=0.09 cfs 0.004 af <br />Total Runoff Area = 0.853 ac Runoff Volume = 0.125 af Average Runoff Depth = 1.75" <br />94.96% Pervious = 0.810 ac 5.04% Impervious = 0.043 ac
The URL can be used to link to this page
Your browser does not support the video tag.