My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 03252025
StAnthony
>
City Council
>
City Council Packets
>
2025
>
CC PACKET 03252025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 12:23:42 PM
Creation date
3/20/2025 12:22:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />ELECTRIC VEHICLE ANALYSIS <br />Public Works two EV pickup trucks have been <br />in service July 2024 -Present. <br />GAS CONSUMPTION COMPARISON <br />July 2023 –Feb. 2024 260 gallons of gas <br />July 2024 –Feb. 2025 0 gallons of gas <br />ANNUAL GAS CONSUMPTION COMPARISON <br />2021 –2023 413 gallons of gas annually <br />2024 Projected 0 gallons of gas annually <br />CHARGING HISTORY TO DATE <br />EV trucks are rated for 275 miles on full charge <br />Public Works EV Trucks are averaging ONE charge <br />every 1-2 months <br />Mileage: 2700/8 months; 340 miles/month average <br />WELL 4 REHABILITATION <br />•Key water supply well <br />•Pump was producing 60% <br />of its designed capacity <br />•Removed pump, casing, <br />shaft, and impellers <br />•Repaired or replaced parts <br />as necessary <br />•Reinstalled, start-up, testing, <br />returned to production <br />•Two-month process <br />Ensures continued <br />reliability and <br />efficiency of well, <br />supporting City’s vital <br />water infrastructure <br />91
The URL can be used to link to this page
Your browser does not support the video tag.