My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 04022025 Worksession
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
2025
>
PK PACKET 04022025 Worksession
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 8:42:02 AM
Creation date
3/27/2025 8:41:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Recommended Overlay Criteria Recommended Rule Examples <br /> Predicted and actual energy use Meet SB 2030 Energy Standard through design and operaƟon; <br /> for 1-3-unit buildings, meet DOE’s Zero Energy Ready Homes <br /> standard. <br /> Predicted greenhouse gas emissions Calculate and report. <br /> Predicted and actual use of potable water Achieve 30% below the water efficiency standards of the <br />Energy Policy Act of 1992. <br /> Predicted use of water for landscaping Achieve 50% reducƟon from consumpƟon of tradiƟonally <br /> irrigated site. <br />UƟlizaƟon of renewable energy Evaluate 2% of on-site renewables; install if cost-effecƟve using <br />SB 2030 guidance. <br />Electric vehicle charging capability (if <br /> parking is included) <br /> Install conduit that allows charging staƟons to be installed at a <br />future date. <br />Diversion of construcƟon waste from <br /> landfills and incinerators <br /> Achieve 75% diversion rate <br /> Indoor environmental quality Use low-VOC (volaƟle organic compounds) materials including <br /> paints, adhesives, sealants, flooring, carpet, as well as ASHRAE <br /> thermal and venƟlaƟon minimums. <br /> Stormwater management Adhere to quanƟty and quality requirements, including <br />infiltraƟon rate, suspended solid, and phosphorous reducƟons. <br />Resilient design Document a design response to several idenƟfied potenƟal <br />shocks and stressors such as uƟlity interrupƟon, extreme <br />rainfall and transportaƟon interrupƟon. Design Team shall <br />integrate the idenƟfied strategies into the design of the <br /> project. <br />Ongoing monitoring of actual energy and <br /> water use <br /> Benchmark using ENERGY STAR® Porƞolio Manager annually. <br /> <br /> <br />DISCUSSION ITEMS FOR COMMISSION FEEDBACK <br />Below are the specific items for discussion and feedback: <br /> Which type of approach would work best for Saint Anthony? (Mandatory approach, scoring approach or <br />suggestion approach) <br /> What priority impacts do we want to target in a city overlay? <br /> What types of projects do we want this policy to apply to? (such as zoning and/or size of building) <br /> <br />ATTACHMENT: <br /> Minnesota Municipal Sustainable Building Policies Guide and appendix of local sustainable building policies
The URL can be used to link to this page
Your browser does not support the video tag.