My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04222025
StAnthony
>
City Council
>
City Council Packets
>
2025
>
CC PACKET 04222025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 9:56:44 AM
Creation date
4/23/2025 9:53:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAINT ANTHONY VILLAGE <br />STATE OF MINNESOTA <br />RESOLUTION 25-032 <br />A RESOLUTION ORDERING IMPROVEMENTS <br />FOR THE 2025 STREET AND UTILITY IMPROVEMENT PROJECT <br />WHEREAS,a resolution of The City Council adopted on the 25th day of March 2025, fixed a date <br />for Council hearing on the proposed improvements: <br />Street & Utility Reconstruction <br />Macalaster Drive from 39th Ave to Railroad <br />Mill and Overlay <br />39th Avenue NE from Stinson Boulevard to Silver Lake Road <br />30th Avenue NE from Stinson Boulevard to Silver Lake Road <br />Armour Terrace from Roosevelt Street NE to Silver Lake Road <br />Murray Avenue from Roosevelt Street NE Coolidge Street NE <br />29th Avenue NE from Silver Lake Road to Highway 88 <br />Roosevelt Street NE from St. Anthony Boulevard to 30th Avenue NE <br />Wilson Street NE from St. Anthony Boulevard to 30th Avenue NE <br />Coolidge Street NE from St. Anthony Boulevard to 29th Avenue NE <br />Anthony Lane N from 29th Avenue NE to Cul-de-sac <br />Miscellaneous Construction <br />Central Park <br />o Removal and replacement of the existing bituminous trail <br />o Installation of new storm sewer along trail to address drainage <br />Pedestrian Safety Improvements <br />o Installation of the pedestrian refuge to enhance the existing pedestrian <br />crossing on Silver Lake Road at 34th Avenue NE. <br />o Bituminous overlay of existing sidewalk along St. Anthony Bouevard from <br />the south City boundary to the bridge <br />Replacement of a damaged hydrant at the intersection of Skycroft Drive and <br />Downers Drive <br />o Removal and replacement of existing hydrant <br />o Removal and replacement of concrete roadway pavement <br />o Installation of new valve for future maintenance <br />Foss Road Lift Station Bypass Improvements <br />o Installation of new forcemain bypass for future City maintenance. <br />WHEREAS,ten days' mailed notice and two weeks' published notice in advance of said hearing <br />was given and the hearing was held thereon on the 22nd day of April 2025, at which <br />time all persons desiring to be heard were given an opportunity to be heard thereon, <br />NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Saint Anthony Village <br />approve such improvements as are hereby ordered in the Council Resolution. <br />Adopted this 22nd day of April , 2025. <br />51
The URL can be used to link to this page
Your browser does not support the video tag.