Laserfiche WebLink
(AIN <br />VOTRTEL <br />ARCHITECTS <br />DATE: 03/04/2025 <br />TO: Saint Anthony Village Staff <br />RE: Roof Replacement <br />PROJECT UNDERSTANDING <br />1795 St. Clair Avenue <br />St. Paul, MN 55105 <br />(651) 696-5186 <br />www.oertelarchitects.com <br />m a feOr <br />iill <br />PUBLIC WORKS <br />• Existing Roof <br />0 4" of rigid insulation — approximately R22 <br />0 22,400 SF of ballasted EPDM roofing <br />0 900 LF of metal parapet cap <br />• Proposed Work <br />o Replace roof membrane with white adhered system <br />■ White EPDM or TPO <br />o Provide code minimum R30 roof insulation — approximately 6" of insulation <br />■ Insulation needs to be screwed down <br />o Plan for future PV panel roof installation <br />o Add required rail around roof hatch <br />LIQUOR STORE - MARKETPLACE <br />• Existing Roof <br />o R25 roof insulation — approximately 4" <br />0 7,250 SF of ballasted EPDM roofing <br />0 360 LF of metal parapet cap <br />• Proposed Work <br />o Replace roof membrane with ballasted EPDM <br />o Provide code minimum R30 roof insulation —approximately 6" of insulation <br />o Add required rail around roof hatch <br />LIQUOR STORE — SILVER LAKE VILLAGE <br />• Existing Roof <br />o R22.2 roof insulation —approximately 4" <br />0 8,600 SF of ballasted EPDM roofing <br />0 450 LF of metal parapet cap <br />• Proposed Work <br />o Replace roof membrane with ballasted EPDM <br />o Provide code minimum R30 roof insulation — approximately 6" of insulation <br />o Add required rail around roof hatch <br />OERTEL ARCHITECTS- I <br />