My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 09082025
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
2025
>
PK PACKET 09082025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2025 1:05:42 PM
Creation date
9/4/2025 1:05:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SILVER POINT PARK: Existing Amenities <br />EXISTING AMENITIES <br />Full accessible playground added in 2024 <br />Half basketball court repaved in 2024 <br />Sidewalk and trail repairs made in 2024 <br />Ice rinks (hockey and pleasure rinks) <br />Two Ballfields <br />SILVER POINT PARK: Dog Park Challenges <br />CURRENT SITUATION <br />•Result in high volumes of parking and traffic <br />•Parking lot and neighborhood is not designed to <br />accommodate <br />Two Ball Fields <br />•Silver Point Park was designed as a retention pond <br />•Often not able to be used <br />Ball Field #2 Flooding <br />•Discussion of sustainability with warmer winters Ice Rinks <br />•Could replace either the ball field #2 or the ice rinks with a <br />dog parkModification Options <br />9 <br />10
The URL can be used to link to this page
Your browser does not support the video tag.