My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WS PACKET 10282025
StAnthony
>
City Council
>
City Council Work Session
>
2025
>
CC WS PACKET 10282025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2025 11:01:10 AM
Creation date
10/28/2025 10:52:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/24/2025 <br />8 <br />2026 UTILITIES INFRASTRUCTURE FUND <br />Utilities Needs Expected Cost <br />Automation of Backwash Valves at Iron Plant $210,000 <br />Roof replacement on Iron Plant $95,000 <br />City-wide water meters are at the end of their useful life and will need to be <br />replaced. $1,100,000 / spread across 3-4 years <br />Wellhouse 3, 4, and 5 roof replacement in 2026 $42,000 <br />Water Treatment Plant Components Assessment Quote (received in 2025) <br />The goal of this assessment is to provide a clearer understanding of when major <br />replacement costs may arise within the water treatment facilities. Staff are currently <br />exploring alternative options to reduce the overall cost of the assessment. <br />$46,800 <br />STORMWATER FUND <br />FUNDING SOURCES <br />Stormwater fees <br />Watershed grants & cost <br />sharing <br />FUNDING USES <br />Permitting (MS4) & agency <br />Reporting <br />Engineering studies <br />Stormwater pond maintenance <br />Flood improvements <br />Water quality activities <br />Equipment <br />23
The URL can be used to link to this page
Your browser does not support the video tag.