My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WS PACKET 11252025
StAnthony
>
City Council
>
City Council Work Session
>
2025
>
CC WS PACKET 11252025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 11:03:55 AM
Creation date
11/20/2025 10:23:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATED INSTALL COSTS - CONTEXT <br />About the proposal <br />The numbers provided are on the higher side as a precaution, and <br />include costs for directional boring, labor, materials, concrete work, <br />energization and commissioning. <br />Costs can be lower if the City assists with concrete restoration. <br />Prices reflect material and commodity prices right now. Next year <br />prices may change due to tariffs or other price volatility on parts. <br />Materials include copper wire, which is more expensive than <br />aluminum but is more resistant to oxidization or corrosion. <br />SILVER LAKE VILLAGE RETAIL AREA <br />Proposal <br />Estimate: $9,300 <br />Power source from Saint Anthony Village Wine & Spirits <br />Pros: High traffic area, high visibility, several stores and <br />amenities nearby, no existing public chargers in this area <br />Cons: Requires tearing up pavement and concrete that <br />was just redone this fall <br />5 <br />6 <br />12
The URL can be used to link to this page
Your browser does not support the video tag.