|
Electrical Permits- Single Family Homes, Apartments, Condos, and Assisted Living
<br />Single Family or Townhome
<br />Building or Garage
<br />Electrical panel change out, repair or service upgrade, new panel replacement is $110.00, sub
<br />panel $50.00
<br />Up to 300 amps $55.00
<br />400 amps $71.00
<br />For each additional 100 amps add $16.00
<br />Single Family or Townhome
<br />Building or Garage
<br />New circuits or reconnected circuits spliced outside of electric panel are at full fee
<br />Charge for each up to 100 amps $9.00
<br />Charge for each 101-200 amps $15.00
<br />For each additional 100 amps add $6.00
<br />Single Family or Townhome Minimum fee (Includes rough-in and final inspection) $100.00
<br />Single Family or Townhome Maximum fee (Includes 2 rough-ins and final inspection (failed
<br />inspections are an additional $50.00 each)$200.00
<br />Apartment Building Remodel Projects
<br />Fee per unit of an apartment or condominium complex. This does not cover service, unit
<br />feeders or house panels.
<br />House Wiring and service is separate. Above fees apply.
<br />$90.00
<br />Transformers
<br />0 -10 kilovolt-amperes $5.00
<br />11 - 75 kilovolt-amperes $45.00
<br />75 - 299 kilovolt -amperes $60.00
<br />Over 299 kilovolt-amperes $165.00
<br />Retro fit lighting
<br />(ballast & lamps only; new fixture is per circuit fee)$ .85 per fixture
<br />Sign Transformer $9.00 per transformer
<br />Solar PV Systems-The inspection fee for the installation is as follows (plan review fee is
<br />$100.00 per hour)
<br />0 watts to and including 5,000 watts $90.00
<br />5,001 watts to and including 10,000 watts $150.00
<br />10,001 watts to and including 20,000 watts $225.00
<br />20,001 watts to and including 30,000 watts $300.00
<br />30,001 watts to and including 40,000 watts $375.00
<br />40,001 watts and larger $375.00 & $25 for each additional 10,000 watts over 40,000 watts
<br />Swimming Pools (Includes 2 inspections plus circuit fees) $100.00
<br />Street Lights and lot lights $5.00 per pole
<br />Traffic Signals $8.00 per standard
<br />Remote Control, Signal,
<br />fire alarm & energy management $ .85 per device
<br />Commercial Electrical Permits
<br />TOTAL VALUATION FEE
<br />$1 to $1,000 $50.00 per trip
<br />$1,001-$2,000 $50.00 for the first $1,000 plus $3.25/additional $100 or fraction
<br />thereof, to including $2,000
<br />$2,001 to $25,000 $82.00 for the first $2,000 plus $14.85/additional $1,000 or fraction
<br />thereof, to including $25,000
<br />$25,001 to $50,000 $423.55 for the first $25,000 plus $10.70/additional $1,000 or
<br />fraction thereof, to including $50,000
<br />$50,001 to $100,000 $691.05 for the first $50,000 plus $7.45/additional $1,000 or
<br />fraction thereof, to including $100,000
<br />$100,001 to $500,000 $1,063.55 for the first $100,000 plus $6.00/additional $1,000 or
<br />fraction thereof, to including $500,000
<br />$500,001 to $1,000,000 $3,463.55 for the first $500,000 plus $5.10/additional $1,000 or
<br />fraction thereof, to including $1,000,000
<br />$1,000,001 and up $6,013.55 for the first $1,000,000 plus $4.00/additional $1,000 or
<br />fraction thereof
<br />Re-Inspection fee (this in addition to all other charges)$50.00
<br />Special Investigation
<br />•Applicable when work was started prior to obtaining any permit required by City Code.
<br />•This fee is due at the discretion of the City Manager, regardless of whether a permit is
<br />issued
<br />100% of Permit Fee, in addition to original fee amount.
<br />Refunds issued only for permits over $100 80% of the fee reimbursed
<br />Fire Fees Page 3
<br />25
|