My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 12092025
StAnthony
>
City Council
>
City Council Packets
>
2025
>
CC PACKET 12092025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2025 4:40:14 PM
Creation date
12/5/2025 4:38:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Right of Way <br />Escrow <br />Right of Way Permit Escrow: <br />$2,000.00 minimum escrow (for up to 10 lots). Plus $20 escrow per <br />additional lot. All applications to be reviewed by the Public Works <br />Director. Additional escrow may be requested depending on scope <br />of work. <br />Fees <br />Annual Fee $75.00 <br />Hole $150.00 <br />Trench $70.00 for first 100 lineal feet, $25.00 for each additional 50 lineal <br />feet (plus hole fee) <br />Boring $150 for first 100 lineal feet, $0.70 for each additional 50 lineal feet <br />(plus hole fee) <br />Obstruction permit base fee $50 plus $.05/lineal foot <br />Permit Extension fee $55.00 <br />Street Excavation (§150.046) $75.00 <br />Small Cell Wireless ROW Rent $150.00 per year (plus $25.00 per site) <br />Small Cell Wireless Monthly Electrical Fee <br />Actual Cost or $73.00 per radio node less than or equal to 100 <br />maximum watts; <br />$182.00 per radio node over 100 maximum watts (whichever is <br />greater) <br />Fire Control Devices <br />Size Amount <br />2"$8.25 <br />3"$11.00 <br />4"$16.50 <br />6"$22.00 <br />8"$27.50 <br />10"$44.00 <br />Irrigation Rates $4.41 per 1,000 gallons <br />Sewer Connection Permit $850.00-per Metropolitan Council Environmental Services (MCES) <br />units initial or re-determination. <br />Sewer Rates $5.25 per 1,000 gallons, quarterly Collection system charge $24.75 <br />per residential equivalency unit. <br />Storm Water Facilities <br />Classification Quarterly Charge <br />1-Cemetaries, parks, golf courses, railroads, vacant land $19.69 per acre <br />2-R-1, R-1A, and R-2 residential $19.10 per unit <br />3-R-3 residential $19.10 per unit <br />4-Schools and institutional uses $68.15 per acre <br />5-R-4 residential, churches and manufactured home park $87.21 per acre <br />6-Commercial and industrial $111.98 per acre <br />Water Connection Permit $850.00-per Metropolitan Council Environmental Services (MCES) <br />units initial or re-determination. <br />Residential Water Meters <br />Size Amount <br />¾”$360.00 ($175.00 meter + $185.00 radio) <br />1”$460.00 ($275.00 meter + $185.00 radio) <br />Commercial Water Meters Cost of meter dependent upon size and type required. Cost will be <br />included in plumbing permit <br />UTILITIES <br />Page 7 <br />29
The URL can be used to link to this page
Your browser does not support the video tag.