Laserfiche WebLink
1/9/2026 <br />7 <br />PROJECT ACTIONS – HIGH PRIORITY <br />Time PeriodAction StepsActionProject <br />2026-2028 <br />2029-2030 <br />•Invite Hennepin County <br />Commissioner to join a <br />walk audit at this site, align <br />with bike bus crossing or <br />school activity. <br />•Coordinate with Hennepin <br />County staff around this <br />location as a vital SRTS <br />connection and better <br />understand crosswalk <br />guidance considerations. <br />•Coordinate with Ramsey <br />County on upstream traffic <br />configuration study. <br />•Advocate for improved crossing <br />infrastructure at this location as part of <br />a corridor approach to Silver Lake Road <br />(school crossing corridor), potentially <br />including a raised crossing, median <br />island, advanced warning signage, or <br />other treatments consistent with the <br />existing crossing at 34th Avenue NE. <br />•To support crossing, conduct an <br />engineering study of upstream traffic <br />behavior (southbound) and lane <br />configuration. Specifically, explore <br />potential to make a southbound lane of <br />Silver Lake Road NE Right-Turn Only at <br />37th Avenue NE, and have one lane carry <br />through the intersection southbound. <br />Silver Lake <br />Road NE at <br />36th <br />Avenue NE <br />PROJECT ACTIONS – HIGH PRIORITY <br />Time PeriodAction StepsActionProject <br />2029-2030•Continue coordination <br />with Hennepin County <br />around previously <br />developed project scope. <br />•Coordinate with <br />Minneapolis Park and <br />Recreation Board (MPRB) <br />on Grand Rounds <br />consistency through the <br />area. <br />Support County exploration <br />of double roundabout design <br />for two existing intersections <br />along Saint Anthony Blvd. <br />Saint Anthony <br />Boulevard at <br />Kenzie Terrace <br />and New Brighton <br />Boulevard <br />13 <br />14 <br />11