Laserfiche WebLink
1/9/2026 <br />10 <br />PROJECT ACTIONS – MEDIUM PRIORITY <br />Time PeriodAction StepsActionProject <br />2029-2030•Coordinate with Ramsey <br />County to secure <br />dedicated staff time for <br />an engineering study. <br />Coordinate with Ramsey <br />County on an engineering <br />study to identify crossing <br />improvements for people <br />walking and biking through this <br />intersection, to address long <br />crossing distances and <br />challenging signal timing. <br />29th Avenue NE <br />/ County Road C <br />W at New <br />Brighton <br />Boulevard / <br />County Road 88 <br />PROJECT ACTIONS – LOW PRIORITY <br />Time PeriodAction StepsActionProject <br />2031-future- Long-term, pursue <br />regional solicitation or <br />other active <br />transportation funding <br />to connect this gap in <br />the network. <br />•Explore formalizing a grade- <br />separated railroad crossing <br />along MacAlaster Drive NE. <br />•If the long-term vision for a <br />rail-with-trail along this <br />corridor is realized, leverage <br />that construction to create a <br />connection north and south at <br />MacAlaster Dr NE. <br />Railroad <br />Crossing at <br />MacAlaster <br />Drive NE <br />19 <br />20 <br />14