My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 02102026
StAnthony
>
City Council
>
City Council Packets
>
2026
>
CC PACKET 02102026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2026 10:33:05 AM
Creation date
2/10/2026 10:29:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AC <br />T <br />I <br />V <br />E <br /> <br />T <br />R <br />A <br />N <br />S <br />P <br />O <br />R <br />T <br />A <br />T <br />I <br />O <br />N <br /> <br />A <br />C <br />T <br />I <br />O <br />N <br /> <br />P <br />L <br />A <br />N <br />Sa <br />i <br />n <br />t <br /> <br />A <br />n <br />t <br />h <br />o <br />n <br />y <br /> <br />V <br />i <br />l <br />l <br />a <br />g <br />e <br />, <br /> <br />M <br />N <br />79 <br />Project Action: What is being suggested?Description: What is the <br />project opportunity? <br />Action Step: What is a <br />next step(s) to take?Time Period <br />Neighborhood <br />Bike Route <br />System and <br />Improved <br />Crossings <br />Consider signage and incremental low- <br />cost/quick-build infrastructure <br />improvements to designate a <br />neighborhood bike route system. <br />Explore crossing improvements along <br />the proposed network at busier cross- <br />streets, such as 29th Avenue <br />Northeast and 33rd Avenue Northeast. <br />Opportunity to improve comfort <br />and visibility of biking on <br />neighborhood routes, while <br />improving crossings for people <br />walking and biking. <br />Identify set of <br />possible crossing <br />treatments based <br />on existing <br />infrastructure and <br />design guidance. <br />Incorporate new <br />crossing locations <br />into existing City <br />maintenance <br />processes for <br />roadway paint and <br />signage. <br />2026-2028 (YEARS 0-2) <br />Project Actions – Medium Priority <br />The following are project actions that will support the implementation of active transportation.
The URL can be used to link to this page
Your browser does not support the video tag.