My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WS PACKET 05122026
StAnthony
>
City Council
>
City Council Work Session
>
2026
>
CC WS PACKET 05122026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 1:08:36 PM
Creation date
5/13/2026 1:08:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Included in this section is a note that applicants may seek relief by applying for a variance. Since the <br />Sustainable Building Ordinance is a component of the zoning ordinance, the terms of the zoning <br />variance process would apply to this section. <br />The third aspect of the proposed ordinance sets a series of standards that would apply to the buildings <br />identified in the second section. These include a reduction in energy use, a reduction in water use, <br />modifications to incorporate renewable energy sources, compliance with the City’s EV charging <br />requirements, a plan for diversion of construction waste from landfills and incinerators, and <br />improvements that will reduce stormwater runoff from the site. <br />Finally, the fourth section establishes a compliance and monitoring protocol through a third party <br />evaluator. This draft suggests that evaluation would occur at both permit application and one-year <br />stages to measure the impacts of both building compliance and ordinance effectiveness. Other methods <br />may be appropriate in this regard. <br />RECOMMENDATION/COUNCIL ACTION <br />Staff asks the Council to review the draft ordinance to ensure that the proposed ordinance reflects the <br />Council’s priorities. The PEC recommended this draft, modified in a few places to add clarity and ensure <br />consistency with the City’s Climate Plan objectives. <br />NEXT STEPS <br />Subject to Council comment and direction, this draft ordinance would next be reviewed by Planning <br />Commission which would hold a formal public hearing. Following the public hearing, the ordinance <br />would be sent back to City Council for three ordinance readings, which is standard practice based on the <br />City Code. <br />ATTACHMENTS <br />•Draft Ordinance 2026-XX <br />11
The URL can be used to link to this page
Your browser does not support the video tag.